Notice of Determination

Saguenay – November 8 2021 – Saguenay Port Authority has determined that the proposed project; Tree Clearing of the Centerline of the Saguenay IP Zone Access Corridor and Geotechnical investigations, located in the Industrial Port Zone is not likely to cause significant adverse environmental effects

This determination was based on a consideration of the following factors:

  • technically and economically feasible mitigation measures

Saguenay Port Authority is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, Saguenay Port Authority may carry out the project, exercise any power, perform any duty or function to enable the project to be carried out.

Document Reference Number: 2