West Moberly First Nation Health Centre/Administration Building Bank Stabilization and Erosion Control Project

West Moberly First Nation is planning to construct runoff and erosion control measures on the bank behind the community health centre and administrative buildings. The project will include ditch extension, slope re-grading, hydroseeding, placement of riprap and other erosion control measures. An abandoned well will be decommissioned. The project is intended to protect the slope from further degradation and protect the buildings at the bottom of the slope. 


Latest update

August 18, 2023 – The public comment period on the project is closed. The Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Contacts

Shauna Stugeon
Indigenous Services Canada
Shauna Sturgeon, Sr. Engineer
600 - 1138 Melville Street
Vancouver, British Columbia V6E 4S3
Telephone: 604-818-9345
Email: Shauna.Sturgeon@sac-isc.gc.ca


  • Location

    • West Moberly First Nation (British Columbia)
  • Nature of Activity

    • Maintenance activities (fences, walls)
  • Assessment Status

    In progress
  • Start Date

    2023-07-19
  • Proponent

    West Moberly First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    85778