New Pile Installation for Recreational Dock - Public Comments Invited

August 14, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed New Pile Installation for Recreational Dock, located at 4505 Belcarra Bay Road, Village of Belcarra  is likely to cause significant adverse environmental effects. Please submit written comments by September 12, 2020.

To help inform this determination and a decision on whether or not to approve the proposed project, the Vancouver Fraser Port Authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by September 12, 2020 via the online commenting tool or to:

Vancouver Fraser Port Authority
Project and Environmental Review
100 The Pointe, 999 Canada Place
Vancouver, B.C. Canada  V6C 3T4

per@portvancouver.com

The Proposed Project

Blue Water Systems on behalf of the upland property owner proposes to conduct maintenance and repair works to an existing recreational dock located in Burrard Inlet at 4505 Belcarra Bay Road, Village of Belcarra. The proposed works include the installation of two steel piles to support and secure the existing float. The dock is currently anchored to the seabed by chains and anchors, which will be removed following the installation of new support piles. The piles are anticipated to be installed by barge and crane and driven by vibratory and/or drop hammer.

Document Reference Number: 1