Connected Coast Fibre-Optic Cable Installation Project
Connected Coast Fibre Optic Cable Installation
End of Public Comment Period
August 25, 2021 – The public comment period on the Connected Coast Fibre Optic Cable Installation project is closed. The federal authorities are considering comments received to help inform their determination on whether the project is likely to cause significant adverse environmental effects.
Document reference number: 2