Installation of a new manifold for loading vessels (berth 96, port of Montreal) – The public is invited to comment by September 24th 2021

 

August 25th, 2021 – A new project has been proposed and before proceeding, the Montreal Port Authority (MPA) must decide whether the proposed project is likely to cause significant adverse environmental effects.

 

To help inform this decision, the MPA is inviting comments from the public respecting that determination. All comments received will be considered public [and may be posted online]. For more information, individuals should consult the Privacy Notice on the Registry website.

 

Written comments must be submitted by September 24th, 2021 to:

 

Port of Montreal

2100, Pierre-Dupuy avenue, Wing 1

Montréal, QC, H3C 3R5

Telephone: 514-283-7050

Email: communications@port-montreal.com

 

The Proposed Project

Suncor Energy wishes to install at its Montreal-East Terminal, a new manifold for loading bulk petroleum products in vessels. The new manifold, located at sections 96 of the port of Montreal, will prevent interference with users of adjacent berth caused by the existing manifold.

Document Reference Number: 1

Date modified: