Notice of Determination
The Trois-Rivières Port Authority (TRPA) has determined that the proposed Project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation measures taken into account for this determination are:
- Water, soil and air pollution prevention;
- Noise pollution prevention.
Therefore, the TRPA may perform any duty or function to enable the project to be carried out in whole or in part.
Document Reference Number: 2