The Proposed Project

Sunchild First Nation plans to upgrade a watercourse crossing located on an unnamed tributary to the Baptiste River. The proposed project includes the replacement of four existing multiplate culverts (2700mm Ø x 50m length) with a single open-bottom arch culvert (11023mm x 2448mm x 31040mm). The roadway in the vicinity of the culvert will also be upgraded.