Québec – May 26, 2023 Indigenous Services Canada has determined that the proposed Thonnakana Grand Chief Street Extension Project is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

  • technically and economically feasible mitigation measures.

Mitigation measures for this determination considered:

  • Protection of species at risk
  • Protection of migratory birds
  • Surface water protection
  • Fish Habitat Protection
  • Wetland
  • Soil protection
  • Air protection
  • Well-being and safety of the population
  • Wildlife protection
  • Flora protection
  • Carrying-out compensatory works

Document reference number: 2

Date modified: