Reconfiguration of a road of 550 meters, Port of Montreal in Contrecoeur
Mitigation measures taken into account for this determination are:
- Management of nuisance (light pollution, noise and dust)
- Protection of riparian strips
- Management of excavated soils and sediments
- Management of residual materials and hazardous materials
- Protection of biodiversity: Installation of anti-intrusion fences, capture and relocation of species (with permit), protection of the bank swallow nesting box with a buffer zone
- Compensation for tree cutting: Plantation of 2 trees for each tree removed (DBH > 10 cm)
- Habitat enhancement for monarchs
Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part.
Document reference number: 2