Public Comment Period on Intent to Make a Determination
Energy Performance Contract (EPC) McNaughton Feeder Replacement- Canadian Forces Base Kingston

March 22, 2024 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by March 31, 2024 to:
Andrew Wollin, Base Environment Officer, Canadian Forces Base (CFB) Kingston
Mailing Address:  11 Mercury Crescent, Kingston
Ontario, Canada, K7K 7B4
E-mail: andrew.wollin@forces.gc.ca

or Harly Banguera, Project Manager, Real Property Operations Unit (Ontario) Detachment Kingston
Mailing Address:  6 Moro Street, Kingston
Ontario, Canada, K7K 7B4
E-mail:  harly.banguera@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project. The McNaughton medium voltage system is being updated. A new electrical distribution loop will be installed along existing roadways throughout Canadian Forces Base (CFB) Kingston on the McNaughton side of the base, north of Highway 2. This work includes adding a new switchgear. The existing electrical lines will be removed and associated concrete encased ducts abandoned in place. All excess soil will be characterized before removal from site. Disturbed areas will be restored with topsoil and grass seed.

Document reference number: 1

Date modified: