Sunrise Drive Road Relocation
Sunrise Drive Road Relocation – Public Comments Invited
April 29, 2025 – Indigenous Services Canada must determine whether the proposed Sunrise Drive Road Relocation project is likely to cause significant adverse environmental effects.
To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.
Written comments must be submitted by May 29, 2025 to:
Indigenous Services Canada – Environment
PO BOX 160
Amherst, NS
B4H 3Z3
The Proposed Project
The project will include the upgrading of the existing all-terrain and walking trail to a roadway, which will allow vehicular traffic to access Rocky Point Subdivision. The approximate footprint is 200m x 20m. Project activities include site preparation (clearing and grubbing of the site), construction of new road, installation of watermain and installation of drainage structures.
Document reference number: 1