Notice of Determination

September 22, 2025 – The Greater Toronto Airports Authority has determined that the proposed Silver Dart Tank Farm Electrical & Mechanical Modifications Project located at Toronto Pearson International Airport is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

· Impacts on rights of Indigenous peoples.

· Indigenous knowledge.

· Community knowledge.

· Comments received from the public; and

· Technically and economically feasible mitigation measures.

 

Mitigation measures taken into account for this determination are:

General

  • All work to be conducted in compliance with the Toronto Pearson Airport Construction Code.
  • All activities at the airport are conducted in an environmentally responsible manner as per Toronto Pearson's Environmental Management System and policies.
  • The location of the work is an already developed area.

Water Quality and Quantity

  • Implementation of the project's Sediment and Erosion Control Plan throughout construction.
  • Implementation of the project's Environmental Response Plan.
  • Implementation of the project's Pipeline Shutdown & Removal Procedure.

Air Quality

  • Implementation of the project's Dust Control Procedure

Soil Quality

  • Implementation of the project's Soil Management Plan.

Site Restoration

  • Any disturbed area will be restored to existing conditions or better.

The Greater Toronto Airports Authority is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, the Greater Toronto Airports Authority may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

 

Document reference number: 2

Date modified: