Notice of Determination

Edmonton – March 20, 2026 – Indigenous Services Canada has determined that the proposed Paul First Nation Solar Energy Project Interconnection Line is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

  • impacts on rights of Indigenous peoples;
  • Indigenous knowledge;
  • community knowledge;
  • comments received from the public; and
  • technically and economically feasible mitigation measures.

Mitigation measures taken into account for this determination are:

  • Construction Environmental Management Plan;
  • Environmental protection measures for wetlands, watercourses, wildlife, and migratory birds;
  • Spill response and reporting procedures;
  • Waste management requirements

Document reference number: 2

Date modified: