Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Skip to Filters

510 results

Project Great Sandhills Railway Switching Operation at North West Terminal Project

  • Location (1 kilometre east of Unity, Saskatchewan)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80998
  • Last Modified: 2020-10-21
  • Relevance: 10298.14
  • Great Sandhills Railway Ltd. is proposing to expand the existing North West Terminal, a grain handling facility located one kilometre east of Unity, Saskatchewan and serviced by the Canadian National Railway (CN) and the Canadian Pacific Railway (CP). As proposed, the Great Sandhills Railway Switching Operation at North West Terminal Project would include three loop tracks, two shop tracks, a wye track, and a repair shop. The new tracks would reduce congestion on the mainline by allowing CN and ...

Project Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC

  • Location (5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81086
  • Last Modified: 2020-10-20
  • Relevance: 10295.47
  • TELUS Communications Inc. is proposing the installation of a new antenna on the existing tower structure, for a microwave radio communication link from Sechelt BC to Cawley Point BC in the Sunshine Coast area. The Sechelt system is located on the Sechelt Band Lands No 2 Reserve, and the installation will include a 1.8m diameter microwave antenna mounted at the top of an existing 36m radiocommunication antenna tower. This system will carry  high capacity Ethernet network traffic ...

Project Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild

  • Location (The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81085
  • Last Modified: 2020-10-19
  • Relevance: 10292.85
  • The Canadian Coast Guard identifies locations where aids to navigation (nav-aids) are required to be constructed or modified to better provide their service and to improve the safety to those who maintain them. The Project aligns with the CCG and Federal Infrastructure Initiative's goal of providing safe, economical, and efficient services for marine navigation and is critical for Canadian Coast Guard mandate of providing safe and accessible waterways. It has come to the Canadian Coast ...

Project Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation

  • Location (Sakimay IR 74, Shesheep IR 74A, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81083
  • Last Modified: 2020-10-19
  • Relevance: 10292.5
  • The project area is comprised of the Designated Cottage Area within Shesheep IR 74A and Sakimay IR 74. The area is not a new development, but the renewal of leases including an inventory of vacant lots on a previously developed cottage lot area. The scope of the project includes the continued construction (as applicable), operation and maintenance of a cottage and/or other dwellings (i.e. mobile home, camper trailer), on a cottage lot (residential/recreational lease) situated on ...

Project Halifax Stanfield Runway 14-32 Terrain Removal

  • Location (Enfield, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80465
  • Last Modified: 2020-10-19
  • Relevance: 10291.94
  • At Halifax Stanfield International Airport, three areas of terrain near Runway 14-32 require modification to adjust grading and elevations.  The adjustment of the terrain will include removal and off-site disposal of approximately 8,000 m3 of pyritic slate bedrock, which underlies much of the airport property.  Off-site disposal will occur at an approved facility, following analytical testing of the material to confirm the absence of contaminants.  The areas will be reinstated ...

Project Webequie Supply Road Project

  • Location (McFaulds Lake area - Eastern limit, Ontario) (Webequie First Nation - Western limit)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80183
  • Last Modified: 2020-10-19
  • Relevance: 10291.4
  • Webequie First Nation is proposing the construction and operation, including maintenance, of a 107-kilometre all-season road connecting the Webequie Airport and the McFaulds Lake area in northern Ontario. The corridor would be approximately 35 metres in width in order to accommodate a two-lane gravel surface industrial supply road and could enable future infrastructure development such as transmission lines and broadband. As proposed, the Webequie Supply Road Project would connect Webequie ...

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2020-10-19
  • Relevance: 10291.39
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 190 to 230 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could ...

Project Junior Commissariat Officers' Quarters - Recapitalization Project

  • Location (Niagara National Historic Sites, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81003
  • Last Modified: 2020-10-18
  • Relevance: 10285.1
  • The recapitalization of the Junior Commissariat Officers' Quarters, a federally Recognized Heritage Building, is part of a series of Federal Infrastructure Initiative projects initiated in 2015 at Butler's Barracks National Historic Site. The Junior Commissariat Officers' Quarters is structurally unsound in certain areas, and renovations to the structure will be substantial including the replacement of the roofing system, stabilization and repointing of the chimneys, ...

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 54755
  • Last Modified: 2020-10-16
  • Relevance: 10279.43
  • Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 km from Marathon, Ontario. The proposed project would include three to four open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 22,000 tonnes per day ...

Project Demolition of Office Building and Parking Canopies

  • Location (Demolition of Office Building and Parking Canopies, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81082
  • Last Modified: 2020-10-16
  • Relevance: 10279.32
  • The proposed project  RDM Enterprises Ltd. are proposing to demolish a two-storey 2,660 square foot (~250 square metres) office building and two parking canopies with footprints of approximately 16,150 square feet (~1500 square metres) and 8,600 square feet (~800 square metres) at their facility at 10897 Timberland Road in Surrey BC. The structures will be removed by way of contents removal, possible hazardous products and materials removal and subsequent mechanical demolition for ...

Project Frog Lake Waste Management Transfer Station

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81081
  • Last Modified: 2020-10-16
  • Relevance: 10279.24
  • A new waste management transfer station will be built to replace the existing facility at Frog Lake, Alberta.  The new facility will provide more effective management and separation of waste materials and improved safety and security.  In doing so they will reduce tipping fees and give the Frog Lake First Nation more control over the operations.  the project will include a 1.3ha site adjacent to the existing wastewater lagoons, an upgraded access road, a security fence and ...

Project Telus Roehampton CP Rail Yard Mobility

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81080
  • Last Modified: 2020-10-16
  • Relevance: 10278.41
  • Telus is proposing to connect fiber service to a mobility shelter on a CP Rail Yard, including replacing an existing pole and pedestal, connecting conduit to existing pedestals, and adding new 1-100mm HDPE conduit through directional drilling to tie into an existing line and pedestal in the Town of Banff near Mountain Goat Lane and Lynx Street

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2020-10-15
  • Relevance: 10275.24
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Star Blanket Water Treatment Plant Upgrades

  • Location (Star Blanket First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81079
  • Last Modified: 2020-10-15
  • Relevance: 10275.21
  • The Proposed Project Design and construct a new water treatment plant for Star Blanket First Nation to be located on S10 TP23 R11 W2M. The new plant will include concrete reservoir with a capacity of 420,000 liters, one new well with pump and raw water supply line, bio-filter pre-treatment, membrane final treatment and distribution pumping. The plant will provide 2.0 lps of treated water. The buiding size is approximately 500 m2. The new building is located just north west of the old water ...

Project Kehewin Treatment Centre - 2020-3825

  • Location (Kehewin Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81036
  • Last Modified: 2020-10-15
  • Relevance: 10274.66
  • The Kehewin Treatment Centre will fill a need for shelter and access to social resources for the Kehewin Cree Nation. Proposed site: On reserve lands directly east beside the Kehewin Health Centre, near Eagles Landing Convenient Store along the north side of Highway 657. "Construction" includes placing 6 ATCO trailers from ATCO Structures on the empty grass lot (previously disturbed) within the core area of the community. The trailers will serve as a quarantine zone by providing ...

Project Dock Removal - Georgian Bay Islands National Park

  • Location (Georgian Bay Islands National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81075
  • Last Modified: 2020-10-15
  • Relevance: 10274.54
  • The crib structure for several of our docks has been severely damaged from high water and ice over the past two years. The locations of these docks are Honey Harbour, Tonch South and Tonch East and one dock in Frying Pan Bay. These docks are unusable and a safety concern. Removal of the dock and cribs will be done through contract using a barge with excavator. The complete structure will be removed including the wooden frame and large stones within the crib. New docks for these locations are in ...

Project Golden Ears Forcemain (GDEFM) Project

  • Location (Golden Ears Forcemain Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80995
  • Last Modified: 2020-10-15
  • Relevance: 10272.49
  • The proposed project Metro Vancouver proposes to design, construct, and install twin sewer forcemains beneath the Fraser River to connect the new Golden Ears Pump Station, located north of the Fraser River, to the expanded Northwest Langley Wastewater Treatment Plant. This project is a component of a larger long-term servicing plan for Metro Vancouver to divert waste from Maple Ridge and Pitt Meadows to an upgraded Northwest Langley Wastewater Treatment Plant (NLWWTP) in the Township of ...

Project Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning

  • Location (Montreal Lake IR 106B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81076
  • Last Modified: 2020-10-14
  • Relevance: 10271.26
  • Construction of the Solid Waste Transfer Station at S31-T52-R27-W3M and decommissioning of the existing disposal site. Approximately 500 lin.m. of perimeter chain link fence surrounding the site. New access roadways and 125m x 125m built up gravel pad serving as the transfer station area. Concrete retaining walls for ramp disposal area and separation of non-household waste materials. Used oil storage tank, used battery storage container and 30 cu.yd. waste bins will also remain on site ...

Project Tunnel Repairs

  • Location (National Defence Medical Centre Dental Wing, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81066
  • Last Modified: 2020-10-14
  • Relevance: 10271.12
  • Repair of existing underground tunnel located in vicinity of National Defence Medical Centre Dental Wing and Central Heating Plant. Project scope is excavation and exposure of the tunnel structure, and resealing of the tunnel's expansion joints. Specific project activities will include excavating to expose the exterior walls of the existing concrete tunnel, repairing the joints, followed by returning the soil back into place with dressing. It is expected that this project will be ...

Project Rideau Ferry Bridge Rehabilitation, County of Lanark

  • Location (County of Lanark, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81078
  • Last Modified: 2020-10-14
  • Relevance: 10271.1
  • The project involves rehabilitation of an existing bridge that crosses the Rideau Canal at the interface between Big Rideau Lake and Lower Rideau Lake. The proponent is the County of Lanark. The following is a synopsis of the proposed work:                In fall of 2021 work will be focused on the substructure, and includes re-facing the abutments (which are terrestrial) with new concrete, and replacing the bearings ...

Project Castle Project

  • Location (Elkford, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80702
  • Last Modified: 2020-10-14
  • Relevance: 10271.1
  • Teck Coal Limited is proposing to expand its existing Fording River Operations, a metallurgical coal mine located approximately 29 kilometres north of Elkford, British Columbia. As proposed, the Castle Project would include project-specific components such as an open pit, waste-rock storage areas, warehouses, maintenance and fueling facilities, access roads on Castle Mountain and linkages to Fording River Operations' power and utilities. The Castle Project would maintain the production ...

Project Marine Operations Facility

  • Location (Marine Operations Facility, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81077
  • Last Modified: 2020-10-14
  • Relevance: 10271
  • The proposed project  Saam Towage are proposing to construct a marine operations facility to support tug towage activity in and around the Vancouver Harbour. The proposed works include the installation of a single-storey wood-frame modular building with a footprint of approximately 2,650 square feet (~250 square metres) and a paved loading area for delivery trucks. The building will be ...

Project YUL Montréal-Trudeau International Airport - Replacement of an electrical service entrance to supply power to an existing building

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81074
  • Last Modified: 2020-10-14
  • Relevance: 10270.32
  • The project consists of replacing the electrical service entrance.  This work requires the addition of two new utility poles with overhead wiring including an underground portion from the last pole to the new transformer. The project has been approved by Hydro-Québec. In order to avoid power supply problems and possible breakdowns, it is hoped that the work will be completed before winter.

Project Proposed Dredge Material Management Site, Toney River, Pictou County, NS

  • Location (The Toney River property is located along the Sunrise Trail (Hwy 6) in Toney River, Pictou County, NS (PID #65210932)., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81062
  • Last Modified: 2020-10-14
  • Relevance: 10270.19
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake the development of a dredge material management site intended to be used to receive, store, and manage sediment material resulting from maintenance dredging activities conducted at Toney River Small Craft Harbour. Site works will involve the construction of an access road that will facilitate the transportation of dredge material from the harbour to the selected location within the proposed property that will ...

Project Ogilvie Culvert Decommissioning

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80993
  • Last Modified: 2020-10-14
  • Relevance: 10268.39
  • The approximate 116-year old concrete culvert arch structure has not been used for process water discharge for many years. The concrete structure is reaching the end of its service life and should be decommissioning by permanently filling it in to ensure safety users of the culvert, CN and Neighbouring companies. The culvert is located at the rear east side of the ADM facility situated at 950 Mill Street, Montreal, Quebec and at the south-west corner of the Windmill-Point Basin.

Project 5th Canadian Division Support Base (CDSB) Gagetown Green Power Purchase Agreement (PPA)

  • Location (5th Canadian Division Support Base (CDSB) Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81073
  • Last Modified: 2020-10-13
  • Relevance: 10266.99
  • The Government of Canada is committed to using 100% clean electricity by 2022 where available, and through the Pan Canadian Framework on Clean Growth and Climate Change, will produce and purchase new renewable electricity that will displace production of the high carbon portion of the electricity grid. The Government of Canada is also targeting industry to reduce greenhouse gases (GHGs) and look to the electricity sector as a priority for this reduction. To respond to this goal, the Department ...

Project Reorganisation of the Grosse Île Harbour, Îles-de-la-Madeleine

  • Location (Grosse-Île, Îles-de-la-Madeleine, QC, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80826
  • Last Modified: 2020-10-13
  • Relevance: 10266.92
  • The harbour redevelopment project proposes to relocate a section of Breakwater 301 to allow for the installation of a portion of the existing and new floating pontoons, which will help relieve congestion in the fishing harbour. In addition to this work, wooden cribs (fixed docks 1 and 2) will be built to geometrically optimize the junction between the relocated breakwater, the boat launch and the existing wharf. Thus, the two existing lines of floating pontoons will be removed and the most ...

Project MLCN Montreal LK East Lagoon

  • Location (Montreal Lake IR 106, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81051
  • Last Modified: 2020-10-13
  • Relevance: 10266.9
  • Expansion of the existing East core sewage lagoon and decommissioning of the west core sewage lagoon. Existing 1.10ha primary lagoon cell being expanded with an additional 4.43ha primary lagoon cell. Existing 12,900 cu.m. primary lagoon cell being expanded with an additional 146,252 cu.m. lagoon storage cell. Approx. 5,750 lin.m. of new 150mm dia. DR17 sewage force main from SPS no.2 to the east lagoon. Approx. 500 lin.m. of new 200mm dia. PVC gravity sewer main from SPS no.1 to SPS no.2. The ...

Project GCT Deltaport Expansion - Berth Four Project

  • Location (Delta, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81010
  • Last Modified: 2020-10-13
  • Relevance: 10266.7
  • GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. ...

Project Valentine Gold Project

  • Location (Valentine Lake, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80169
  • Last Modified: 2020-10-13
  • Relevance: 10266.67
  • Marathon Gold Corporation is proposing the construction, operation, decommissioning, and reclamation of an open-pit gold mine located at Valentine Lake, approximately 55 kilometres southwest of Millertown in Newfoundland and Labrador. As proposed, the Valentine Gold Project would include two open pits, disposal piles, crushing and stockpiling areas, site infrastructure, a tailings management facility, and mine site haul and access roads. Production capacity is estimated at 18,000 tonnes ...

Project Keltic Loop Road Rehabilitation - Cape Breton Highlands National Park

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80988
  • Last Modified: 2020-10-11
  • Relevance: 10256.38
  • The purpose of this project is to assess the condition of the existing roadways, as well as the related buried infrastructure and erosion issues. Following the assessment, a consultant will provide the best options for the redesign/rehabilitation of the roadway and buried infrastructure. Once the design has been developed, construction may take place in phases over the site's off-seasons. Keltic Road consists of a one directional looped road, providing access to the Keltic Lodge and ...

Project Maintenance of the DUR226 distribution line by Hydro-Québec in the MNLP, St-Jean-des-Piles sector at Rivière-à-la-Pêche

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80978
  • Last Modified: 2020-10-11
  • Relevance: 10256.38
  • The hydroelectric facilities maintenance project involves the clearing of the electrical distribution line to the Rivière-à-la-Pêche sector by Hydro-Québec in order to ensure the security and stability of the supply.

Project Storage Shed Construction - Port Royal NHS

  • Location (Port-Royal National Historic Site of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80990
  • Last Modified: 2020-10-11
  • Relevance: 10256.38
  • The proposed project will see the construction of a wood frame building (~4m x 7m) at Port Royal National Historic Site. The purpose of the shed is to provide onsite storage for tools and equipment. The project will require the clearing of brush from the construction site, and construction of the wood frame building. Construction is anticipated to occur in autumn 2020. The project will be assessed by a Basic Impact Assessment.

Project Former Electrical Substation Remediation

  • Location (3 Wing Canadian Forces Base Bagotville, situated in the district of La Baie, in the city of Saguenay (Quebec), Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81071
  • Last Modified: 2020-10-09
  • Relevance: 10251
  • This project consists of work execution, labor, materials/supplies and tools needed for the remediation of the contaminated site of the former electrical substation. The work includes but is not limited to: fence removal, excavation and off-site disposal of contaminated soil and plugging or repair of monitoring wells. The work also includes soil import and final grading, seeding and sodding.  

Project Burleigh Falls Dam Replacement, Trent-Severn Waterway

  • Location (Trent-Severn Waterway National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80528
  • Last Modified: 2020-10-09
  • Relevance: 10250.98
  • The project involves a complete replacement of the dam at Burleigh Falls, constructing a new dam 0.5 m downstream of the existing structure and demolition of the old dam. Work involves preliminary repairs to the current dam so it can be used as an upstream cofferdam. A downstream cofferdam will be constructed in order to complete the works. The project will be completed in 2 stages, one half at a time, as not to affect water levels or total discharge. There will be a permanent PCA access road ...

Project Decommissioning of Buried Fuel Lines, Sable Island NPR - Environment and Climate Change Canada

  • Location (Sable Island National Park Reserve of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81069
  • Last Modified: 2020-10-09
  • Relevance: 10250.92
  • The proposed project will see the decommissioning of a series of buried fuel lines which historically supplied fuel oil to various buildings at the Sable Island Main Station and Western Light.  Since the fuel lines are no longer in active use, the continued presence of potential fuel in the lines presents an on-going risk of leakage and contamination.  The objective of the project is to recover fuel oil that may remain in the fuel lines, to remove accessible portions of the fuel lines ...

Project HMCS Hunter Embankment Erosion Repair

  • Location (HMCS Hunter, 90 Mill Street in Windsor, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81070
  • Last Modified: 2020-10-09
  • Relevance: 10250.82
  • The outer limits of the harbour are protected by a harbour wall of varying construction, along the northern and eastern limits. The southern limit (approximately 100 metres) however, is only partially protected (approximately 70 metres) by an armour stone wall. The remaining portion of the southern limit (the southeast corner) consists of an outcrop of land made-up primarily of what appears to be rock and soil that has, over time, been subject to erosion resulting in the need to have the area ...

Project Mohawk Multi Media Inc. - Broadcasting Tower - Riverside Elders Home in Kanesatake, Oka (QC)

  • Location (Riverside Elders Home in the Mohawk First Nation Community of Kanesatake, 518, rang Sainte-Philomène, Oka (Quebec) J0N 1E0, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81063
  • Last Modified: 2020-10-09
  • Relevance: 10250.55
  • Mohawk Multi Media Inc. proposes to build a 56-meter guyed broadcasting tower to improve the coverage of CKHQ-FM radio station in order to serve the entire population of the Mohawk community of Kanesatake. The tower will be installed on the grounds of the Riverside Elders Home in the Mohawk First Nation Community of Kanesatake located at 518, rang Sainte-Philomène, Oka (Quebec) J0N 1E0. The tower will include an omnidirectional antenna that will transmit on the 101.7 MHz frequency. This ...

Project Cedar Beach Minor Dredging

  • Location (Cedar Beach, ON, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80945
  • Last Modified: 2020-10-09
  • Relevance: 10250.53
  • The Town of Kingsville, with the approval of Fisheries and Oceans Canada, wishes to remove approximately 900 cubic feet of built up sand that has deposited within the entrance channel at Cedar Beach, ON and is causing a hazard to marine navigation. Dredged material is to be redeposited on the beach which is believed to be the source.

Project Gravitational Irrigation System to increase food security of Village of Chando Thalay, northern Pakistan

  • Location (Chando Thalay Village, Pakistan, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 81068
  • Last Modified: 2020-10-09
  • Relevance: 10250.33
  • The not-for-profit Mountain and Glacier Protection Organization proposes to manage glacial melt flow to enhance food security and adaptive resilience of the Village of Chando Thalay, District of Ghanche, Giligit Baltistan, northern Pakistan.  High altitude, extreme winters and lack of opportunity for income diversification makes the community vulnerable to crises and external threats.  Climate change has affected water availability on which the community relies for sustenance. The ...

Project Gateway Facilities ULC Apron Expansion and Hangar Construction

  • Location (Halifax Stanfield International Airport, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80706
  • Last Modified: 2020-10-09
  • Relevance: 10250.19
  • UPDATE OCTOBER 9, 2020:  HIAA is awaiting additional information from the Proponent. UPDATE JUNE 22, 2020:  The public comment period has now closed.   Gateway Facilities ULC located at 645 Pratt & Whitney Drive at the Halifax Stanfield International Airport is proposing the following two phase Project:  Phase 1: The extension of Gateway Facilities current asphalt apron Phase 2: Construction of an aircraft hangar and office space Phase 1: The apron ...

Project Construction of 25-Metre Range at Canadian Forces Base 14 Wing Greenwood, Greenwood, Nova Scotia

  • Location (Canadian Forces Base (CFB) 14 Wing Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81067
  • Last Modified: 2020-10-09
  • Relevance: 10250.07
  • The Department of National Defence has an operational requirement to construct a 25-Metre (25m) Range at the Canadian Forces Base (CFB) 14 Wing Greenwood. The site selected for the new range is currently within the active 14 Wing Greenwood Skeet Range site. The 25m Range site is approximately 1km northeast and outside of the active airfield operations zone (AOZ) at Latitude 44°59'43.94" north and Longitude 64°53'32.45" west. The 25m Range site is sand and grass covered ...

Project TELUS Communications Inc - New Telecommunications Tower on Alert Bay No.1 Reserve, Alert Bay, BC

  • Location (49 Atli Street, Alert Bay (British Columbia), on the Alert Bay No.1 Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81064
  • Last Modified: 2020-10-08
  • Relevance: 10247.36
  • TELUS Communications Inc is proposing to construct a 48-meter tall monopole telecommunications tower to provide improved high-speed internet access and wireless service to the Namgis First Nation community. Cellular antennas will be mounted at the top of the tower. All of the equipment necessary to operate this facility will reside within a fenced compound located at the base of the tower. This new tower may undergo future modifications or the addition/replacement of antennas. The site is ...

Project Dene Tha' Hay Lake Old School Remediation

  • Location (Dene Tha' First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81065
  • Last Modified: 2020-10-08
  • Relevance: 10247.13
  • The focus for this program is on continuing the remediation of the contamination (hydrocarbons) that exists in both the saturated and unsaturated zone of the soil. The contamination will be treated with  combination of in situ chemical oxidation and ex situ bioremediation based on areas of particular concern to the community and areas with previous difficulties with insitu treatment. ISCO (in-situ) is planned to continue for zones where excavation is restricted due to existing land use and ...

Project New additive tank for liquid bitumen

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80979
  • Last Modified: 2020-10-08
  • Relevance: 10246.53
  • Suncor Energy Products Partnership wishes to install at its Montreal-East Terminal, located at sections 95-97 of the Port of Montreal, an additive injection system when loading liquid bitumen in tank trucks. The new facilities include a 60,000 liter storage tank with an integrated secondary containment compartment, injection and unloading pumps, flow meters and control panels.

Project Steveston Paramount Maintenance Dredging

  • Location (Steveston Paramount Small Craft Harbour, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80983
  • Last Modified: 2020-10-08
  • Relevance: 10244.81
  • Steveston harbour is on the Fraser river and subject to constant sediment deposition, and as such maintenance dredging is required annually. Access to this harbour is currently restricted and entry and exit plans are based on tide levels.  This project consists of dredging of up to 20,000m3 with disposal at sea.  Completion of this maintenance dredging work will ensure that critical areas within the basin are dredged to a depth which will ensure safe navigation for vessels and safe ...

Project Sunchild Gas Distribution Line

  • Location (Sunchild, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80787
  • Last Modified: 2020-10-07
  • Relevance: 10244.14
  • Sunchild Utilities plans to construct a 6" diameter natural gas distribution pipeline from a well pad located in NW24-23-10W5 to the community distribution line located in NW12-23-10W5M.  A small building on an area 10m2 will be constructed beside the well pad to allow for dehydrating/processing of the gas prior to distribution.  The pipeline will be approximately 3.2 to 3.4 km.  The pipeline will cross a creek and surrounding wetland through directional drilling during ...

Project Alexander First Nation Waste Transfer/Diversion Station Rehabilitation

  • Location (Alexander First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80982
  • Last Modified: 2020-10-07
  • Relevance: 10244.09
  • The objective of this project is to improve the existing transfer station to provide Alexander First Nation (AFN) a safe, functional and versatile solid waste diversion facility to meet the needs of the community. AFN has an existing operating transfer station and has recently transitioned to a direct haul method of waste management therefore the existing facility can be transitioned to a waste diversion station. AFN's solid waste management systems include curbside collection and direct ...

Project Kehewin Cree Nation Transfer Station

  • Location (Kehewin Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80949
  • Last Modified: 2020-10-07
  • Relevance: 10244.08
  • KCN is proposing to construct a waste transfer station (the project) six km southwest of Kehewin, Alberta, and will be located on the existing access road into the KCN landfill. The project will be approximately 0.6 ha in size. Currently, household waste is collected in five roll-off bins at the pow-wow grounds, which is then transported to a nearby landfill. Other waste is transported directly to the KCN landfill. The project is intended to provide a suitable location to deposit ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Date modified: