About the results
Additional documents may be available upon request. To obtain a copy, please see the project page for contact information.
Information provided by external sources may not be subject to the Official Languages Act and is made available in the language(s) provided. This may result in content being displayed in a language different than that of the web page display.
The result count may differ from the number of unique comments. Similar comments by various authors may be grouped as a single comment; while each comment and attachment count as distinct results. Where applicable, please click on the alternate formats link to view additional versions available.
Marathon Palladium Project
Document Amended Decision Statement
- Project Marathon Palladium Project
- Document Category: Additional Information
- Reference Number: 1340
- Document Date: 2024-07-26
- Document: 158275E.pdf
- Relevance: 337.76
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Generation PGM Inc. c/o Jamie Levy, President, Chief Executive Officer and Director 100 King Street West Toronto, ON M5X 1B1 for the Marathon Palladium Project Description of the Designated Project Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The Designated Project would ...
1 alternate format found
French PDF
- Relevance: 286.76
- Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Generation PGM Inc. a/s Jamie Levy, président, chef de la direction et administrateur 100 rue King Ouest Toronto (Ontario) M5X 1B1 pour le Projet de palladium de Marathon Description du projet désigné Generation PGM Inc. propose de construire, d'exploiter et de désaffecter une mine de palladium à ciel ouvert à environ 10 km de Marathon, en Ontario. Le ...
Document Minister's Environmental Assessment Decision Statement
- Project Marathon Palladium Project
- Document Category: Additional Information
- Reference Number: 1334
- Document Date: 2022-11-30
- Document: 145730E.html
- Relevance: 288.51
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Generation PGM Inc. c/o Jamie Levy, President, Chief Executive Officer and Director 100 King Street West Toronto, ON M5X 1B1 for the Marathon Palladium Project Description of the Designated Project Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The Designated Project would ...
1 alternate format found
English PDF
- Relevance: 288.51
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Generation PGM Inc. c/o Jamie Levy, President, Chief Executive Officer and Director 100 King Street West Toronto, ON M5X 1B1 for the Marathon Palladium Project Description of the Designated Project Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The ...
Document Executive summary of the Report of the Joint Review Panel for the Marathon Palladium Project
- Project Marathon Palladium Project
- Document Category: Panel Records
- Reference Number: 1302
- Document Date: 2022-08-02
- Document: 144651E.pdf
- Relevance: 280.02
- MARATHON PALLADIUM PROJECT JOINT REVIEW PANEL REPORT xi EXECUTIVE SUMMARY The Project Generation PGM Inc. (GenPGM or the Proponent) is proposing to build and operate an open pit platinum group metal and copper mine and milling operation located approximately 10 km north of the Town of Marathon, Ontario. The Proponent could also produce magnetite concentrate containing vanadium if it becomes economically feasible. Components for the Marathon Palladium Project (the Project) include ...
1 alternate format found
English HTML
- Relevance: 280.02
- Executive summary of the Report of the Joint Review Panel for the Marathon Palladium Project Please note that this executive summary is an excerpt from the Report of the Joint Review Panel for the Marathon Palladium Project (CIAR #1301) If you experience problems, contact the Impact Assessment Agency of Canada at: registry-registre@iaac-aeic.gc.ca to obtain alternate formats. Document Reference Number: 1302 For questions or information, please contact: Impact Assessment Agency of ...
Refine SearchDisplay Filters
Last ModifiedDisplay Filters
Filters
Result Type Display Filters
Location Display Filters
Assessment Status Display Filters
Assessment Type Display Filters
Nature of Activity Display Filters
Jurisdiction Display Filters
Document Category Display Filters
Participation Notice Display Filters
- 190 results Public Notice - Comment Period on the Environmental Impact Statement Addendum for the Marathon Palladium Project
- 30 results Public Notice: Public Comments Invited on Potential Conditions
- 22 results Public Notice - Marathon Palladium Project - Public comments invited on the draft Amended Joint Review Panel Agreement and Terms of Reference
- 16 results Public Notice: Joint Review Panel Invites Comments on Draft Public Hearing Procedures
- 5 results Public Notice: Notice of Public Hearing for the Marathon Palladium Project (Updated January 6, 2022)
- 1 results Public Notice: Notice of Public Hearing for the Marathon Palladium Project