About the results
Information provided by external sources may not be subject to the Official Languages Act and is made available in the language(s) provided. This may result in content being displayed in a language different than that of the web page display.
The result count may differ from the number of unique comments. Similar comments by various authors may be grouped as a single comment; while each comment and attachment count as distinct results. Where applicable, please click on the alternate formats link to view additional versions available.
Marathon Palladium Project
Skip to Filters
Document Minister's Environmental Assessment Decision Statement
- Project Marathon Platinum Group Metals and Copper Mine Project
- Document Category: Additional Information
- Reference Number: 1334
- Updated: 2022-11-30
- Document: 145730E.html
- Relevance: 369.31
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Generation PGM Inc. c/o Jamie Levy, President, Chief Executive Officer and Director 100 King Street West Toronto, ON M5X 1B1 for the Marathon Palladium Project Description of the Designated Project Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The Designated Project would ...
1 alternate format found
English PDF
- Relevance: 369.31
- Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Generation PGM Inc. c/o Jamie Levy, President, Chief Executive Officer and Director 100 King Street West Toronto, ON M5X 1B1 for the Marathon Palladium Project Description of the Designated Project Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The ...
Document Executive summary of the Report of the Joint Review Panel for the Marathon Palladium Project
- Project Marathon Platinum Group Metals and Copper Mine Project
- Document Category: Panel Records
- Reference Number: 1302
- Updated: 2022-08-02
- Document: 144651E.pdf
- Relevance: 357.46
- MARATHON PALLADIUM PROJECT JOINT REVIEW PANEL REPORT xi EXECUTIVE SUMMARY The Project Generation PGM Inc. (GenPGM or the Proponent) is proposing to build and operate an open pit platinum group metal and copper mine and milling operation located approximately 10 km north of the Town of Marathon, Ontario. The Proponent could also produce magnetite concentrate containing vanadium if it becomes economically feasible. Components for the Marathon Palladium Project (the Project) include ...
1 alternate format found
English HTML
- Relevance: 357.46
- Executive summary of the Report of the Joint Review Panel for the Marathon Palladium Project Please note that this executive summary is an excerpt from the Report of the Joint Review Panel for the Marathon Palladium Project (CIAR #1301) If you experience problems, contact the Impact Assessment Agency of Canada at: registry-registre@iaac-aeic.gc.ca to obtain alternate formats. Document Reference Number: 1302 For questions or information, please contact: Impact Assessment Agency of ...
Refine SearchDisplay Filters
Last UpdatedDisplay Filters
Filters
Result Type Display Filters
Location Display Filters
Assessment Status Display Filters
Assessment Type Display Filters
Nature of Activity Display Filters
Jurisdiction Display Filters
Document Category Display Filters
Comment Tags Display Filters
- 4 results Climate change
- 3 results Project Contribution to Sustainability
- 2 results Air Quality
- 2 results Cumulative effects
- 2 results Fish and Fish Habitat
- 2 results General support of project
- 2 results Groundwater Quality
- 2 results Marine Environment
- 2 results Surface Water Quality
- 2 results Wildlife / Habitat
- 1 results Accidental Events / Malfunctions
- 1 results Community / Regional Services
- 1 results Employment Opportunities
- 1 results General opposition to project
- 1 results Human Health and Well-Being
- 1 results Indigenous Consultation Method
- 1 results Need for the Project
- 1 results Purpose of the Project
- 1 results Sites of Archaeological / Palaeontology / Architectural importance
- 1 results Species at Risk
- 1 results Wetlands
Participation Notice Display Filters
- 190 results Public Notice - Comment Period on the Environmental Impact Statement Addendum for the Marathon Palladium Project
- 30 results Public Notice: Public Comments Invited on Potential Conditions
- 22 results Public Notice - Marathon Palladium Project - Public comments invited on the draft Amended Joint Review Panel Agreement and Terms of Reference
- 16 results Public Notice: Joint Review Panel Invites Comments on Draft Public Hearing Procedures
- 5 results Public Notice: Notice of Public Hearing for the Marathon Palladium Project (Updated January 6, 2022)
- 1 results Public Notice: Notice of Public Hearing for the Marathon Palladium Project