Contrecoeur Port Terminal Expansion Project

Registry Search Mobile

Registry Search

Skip to Filters

486 results

Document Amended Decision Statement

  • Project Contrecoeur Port Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 287
  • Document Date: 2025-11-27
  • Document: 164486E.html
  • Relevance: 384.37
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Montreal Port Authority c/o Paul Bird, Vice-president, Contrecoeur Wing 1, 2100 Pierre-Dupuy Avenue Montreal (Quebec) H3C 3R5 for the Contrecoeur Port Terminal Expansion Project Description of the Designated Project The Montreal Port Authority proposes the construction of a container port terminal with a maximum annual capacity of 1.15 million containers on its property located in ...
3 alternate formats found
English PDF
  • Relevance: 384.37
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Montreal Port Authority c/o Paul Bird, Vice-president, Contrecoeur Wing 1, 2100 Pierre-Dupuy Avenue Montreal (Quebec) H3C 3R5 for the Contrecoeur Port Terminal Expansion Project Description of the Designated Project The Montreal Port Authority proposes the construction of a container port terminal with a maximum annual capacity of 1.15 million containers on its ...
French PDF
  • Relevance: 333.37
  • Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Administration portuaire de Montréal a/s Paul Bird, Vice-président, Contrecoeur Aile 1, 2100, avenue Pierre-Dupuy Montréal (Québec) H3C 3R5 pour le Projet d'agrandissement du terminal portuaire de Contrecoeur Description du projet désigné L'Administration portuaire de Montréal propose l'aménagement d'un terminal portuaire à conteneurs ...
French HTML
  • Relevance: 333.37
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Administration portuaire de Montréal a/s Paul Bird, Vice-président, Contrecoeur Aile 1, 2100, avenue Pierre-Dupuy Montréal (Québec) H3C 3R5 pour le Projet d'agrandissement du terminal portuaire de Contrecoeur Description du projet désigné L'Administration portuaire de Montréal propose l'aménagement d'un terminal portuaire à conteneurs d'une capacité annuelle ...

Document Analysis of the Montreal Port Authority's proposed changes to the Contrecoeur Port Terminal Expansion Project

  • Project Contrecoeur Port Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 286
  • Document Date: 2025-11-21
  • Document: 163895E.pdf
  • Relevance: 383.74
  • Analysis of the Montreal Port Authority’s proposed changes to the Contrecoeur Port Terminal Expansion Project REPORT OCTOBER 2025 IMPACT ASSESSMENT AGENCY OF CANADA ANALYSIS OF PROPOSED CHANGES TO THE CONT RECOEUR PORT TERMINAL EXPANSION PROJECT i Table of contents 1. Introduction .................................................................................................................. 1 2. Proposed changes to the ...
3 alternate formats found
English HTML
  • Relevance: 383.74
  • Analysis of the Montreal Port Authority's proposed changes to the Contrecoeur Port Terminal Expansion Project Report October 2025 On this page 1. Introduction 2. Proposed changes to the project 2.1 Changes included in the designated project 2.2 Changes not included in the designated project 3. Analysis of changes under the Physical Activities Regulations 4. Consultation and engagement 4.1 Proponent's engagement of Indigenous groups 4.2 IAAC consultation on proposed project ...
French PDF
  • Relevance: 332.74
  • Analyse des changements proposés par l’Administration portuaire de Montréal au projet d’agrandissement du terminal portuaire de Contrecoeur RAPPORT OCTOBRE 2025 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA ANALYSE DES CHANGEMENT S PROPOSÉS AU PROJET D ’AGRANDISSEMENT DU T ERMINAL PORTUAIRE DE CONTRECOEUR i Table des matières 1. Introduction ...
French HTML
  • Relevance: 332.74
  • Analyse des changements proposés par l'Administration portuaire de Montréal au projet d'agrandissement du terminal portuaire de Contrecoeur Rapport Octobre 2025 Sur cette page 1. Introduction 2. Changements proposés au projet 2.1 Changements inclus au projet désigné 2.2 Changements non inclus au projet désigné 3. Analyse des changements sous le Règlement sur les activités concrètes 4. Consultation et mobilisation 4.1 Mobilisation des groupes autochtones par le ...

Document Draft Amended Decision Statement

  • Project Contrecoeur Port Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 213
  • Document Date: 2025-09-26
  • Document: 163138E.pdf
  • Relevance: 377.92
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Montreal Port Authority c/o Paul Bird, Vice-president, Contrecoeur Wing 1, 2100 Pierre-Dupuy Avenue Montreal (Quebec) H3C 3R5 for the Contrecoeur Port Terminal Expansion Project Description of the Designated Project The Montreal Port Authority proposes the construction of a container port terminal with a maximum annual capacity of 1.15 million containers on its ...
3 alternate formats found
English HTML
  • Relevance: 377.92
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Montreal Port Authority c/o Paul Bird, Vice-president, Contrecoeur Wing 1, 2100 Pierre-Dupuy Avenue Montreal (Quebec) H3C 3R5 for the Contrecoeur Port Terminal Expansion Project Description of the Designated Project The Montreal Port Authority proposes the construction of a container port terminal with a maximum annual capacity of 1.15 million containers on its property located in ...
French PDF
  • Relevance: 326.92
  • Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Administration portuaire de Montréal a/s Paul Bird, Vice-président, Contrecoeur Aile 1, 2100, avenue Pierre-Dupuy Montréal (Québec) H3C 3R5 pour le Projet d'agrandissement du terminal portuaire de Contrecoeur Description du projet désigné L'Administration portuaire de Montréal propose l'aménagement d'un terminal portuaire à conteneurs ...
French HTML
  • Relevance: 326.92
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Administration portuaire de Montréal a/s Paul Bird, Vice-président, Contrecoeur Aile 1, 2100, avenue Pierre-Dupuy Montréal (Québec) H3C 3R5 pour le Projet d'agrandissement du terminal portuaire de Contrecoeur Description du projet désigné L'Administration portuaire de Montréal propose l'aménagement d'un terminal portuaire à conteneurs d'une capacité annuelle ...

Document Draft Analysis of Montreal Port Authority's Proposed Changes to the Contrecoeur Port Terminal Expansion Project

  • Project Contrecoeur Port Terminal Expansion Project
  • Document Category: For Public Participation
  • Reference Number: 215
  • Document Date: 2025-09-26
  • Document: 163675E.html
  • Relevance: 377.92
  • Analysis of the Montreal Port Authority's proposed changes to the Contrecoeur Port Terminal Expansion Project Draft report September 2025 On this page 1. Introduction 2. Proposed changes to the project 2.1 Changes included in the designated project 2.2 Changes not included in the designated project 3. Analysis of changes under the Physical Activities Regulations 4. Consultation and engagement 4.1 Proponent's Engagement of Indigenous groups 4.2 IAAC consultations on proposed ...
3 alternate formats found
English PDF
  • Relevance: 377.92
  • Analysis of the Montreal Port Authority’s proposed changes to the Contrecoeur Port Terminal Expansion Project DRAFT REPORT SEPTEMBER 2025 IMPACT ASSESSMENT AGENCY OF CANADA DRAFT REPORT: ANALYSIS OF PROPOSED CHANGES TO THE CONTRECOEUR PORT T ERMINAL EXPANSION PROJECT i Table of contents 1. Introduction .................................................................................................................. 1 ...
French PDF
  • Relevance: 326.92
  • Analyse des changements proposés par l’Administration portuaire de Montréal au projet d’agrandissement du terminal portuaire de Contrecoeur VERSION PROVISOIRE DU RAPPORT SEPTEMBRE 2025 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA VERSION PROVISOIRE DU RAPPORT : ANALYSE DES CHANGEMENTS PROPOSÉS AU PROJET D’AGRANDISSEMENT DU TERMINAL PORTUAIRE DE CONTRECOEUR i Table des matières 1. Introduction ...
French HTML
  • Relevance: 326.92
  • Analyse des changements proposés par l'Administration portuaire de Montréal au projet d'agrandissement du terminal portuaire de Contrecoeur Version provisoire du rapport Septembre 2025 Sur cette page 1. Introduction 2. Changements proposés au projet 2.1 Changements inclus au projet désigné 2.2 Changements non inclus au projet désigné 3. Analyse des changements sous le Règlement sur les activités concrètes 4. Consultation et mobilisation 4.1 Mobilisation des groupes ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Contrecoeur Port Terminal Expansion Project
  • Document Category: Additional Information
  • Reference Number: 210
  • Document Date: 2024-07-18
  • Document: 158115E.html
  • Relevance: 335.92
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 284.92
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: