Document Notice of Environmental Assessment Determination

  • Project Suncor Energy Coke Fired Boiler Replacement Project
  • Document Category: Additional Information
  • Reference Number: 5
  • Updated: 2018-02-01
  • Document: 121510E.html
  • Relevance: 229.65
  • Notice of Environmental Assessment Determination Ottawa – February 1, 2018 - The Canadian Environmental Assessment Agency (the Agency) has decided that a federal environmental assessment is not required for the Suncor Energy Coke Fired Boiler Replacement Project pursuant to the Canadian Environmental Assessment Act, 2012 (CEAA 2012). In making this determination, the Agency considered the following factors as indicated in section 10 of CEAA 2012: the description of the project provided ...
1 alternate format found
French HTML
  • Relevance: 178.65
  • Avis de décision d'une évaluation environnementale Ottawa – le 1er février 2018 - L'Agence canadienne d'évaluation environnementale (l'Agence) a décidé qu'une évaluation environnementale du Projet de remplacement de chaudières à coke de Suncor Énergie n'est pas requise en vertu de la Loi canadienne sur l'évaluation environnementale (2012) (LCEE 2012). Afin de prendre cette décision, l'Agence a tenu compte des facteurs suivants tel que présentés à l'article 10 de la LCEE 2012 : la ...

Document Updated Public Notice - Public Comments Invited on a Summary of the Project Description

  • Project Suncor Energy Coke Fired Boiler Replacement Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2017-12-18
  • Document: 121352E.html
  • Relevance: 227.82
  • Updated Public Notice Suncor Energy Coke Fired Boiler Replacement Project — Public Comments Invited Update — January 4, 2018 — The deadline to submit written comments has been extended from January 8 to January 12, 2018. The Agency is aware that some members of the public may not have been able to provide comments or access the Registry Internet site due to a technical issue that occurred between December 30, 2017 - January 2, 2018. The issue is now resolved. As a result, the Agency has ...
1 alternate format found
French HTML
  • Relevance: 176.82
  • Avis public mis à jour Projet de remplacement de chaudières à coke de Suncor Énergie — Période de consultation publique Mise à jour — 4 janvier 2018 — La date limite pour présenter des commentaires écrits a été reportée du 8 janvier au 12 janvier 2018. L'Agence est consciente que des membres du public n'ont possiblement pas été en mesure de faire parvenir des commentaires ou d'accéder au site Internet du Registre en raison d'un problème technique survenu du 30 décembre 2017 au ...

Document News Release - Public Comments Invited on a Summary of the Project Description

  • Project Suncor Energy Coke Fired Boiler Replacement Project
  • Document Category: News Releases
  • Reference Number: 2
  • Updated: 2017-12-18
  • Document: 121223E.html
  • Relevance: 227.82
  • News Release Suncor Energy Coke Fired Boiler Replacement Project — Public Comments Invited December 18, 2017 — Ottawa — Canadian Environmental Assessment Agency The Canadian Environmental Assessment Agency (the Agency) must decide whether a federal environmental assessment is required for the proposed Suncor Energy Coke Fired Boiler Replacement Project located approximately 30 kilometres north of Fort McMurray, Alberta. To help inform this decision, the Agency is seeking comments from ...
1 alternate format found
French HTML
  • Relevance: 176.82
  • Communiqué Projet de remplacement de chaudières à coke de Suncor Énergie — Période de consultation publique Le 18 décembre 2017 — Ottawa — Agence canadienne d'évaluation environnementale L'Agence canadienne d'évaluation environnementale (l'Agence) doit décider si une évaluation environnementale fédérale est requise pour le projet de remplacement de chaudières à coke de Suncor Énergie, situé à environ 30 kilomètres au nord de Fort McMurray, en Alberta. En vue de prendre une décision ...

Document Summary of a Project Description of a Designated Project

  • Project Suncor Energy Coke Fired Boiler Replacement Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Updated: 2017-12-04
  • Document: 121224E.pdf
  • Relevance: 227.26
  •               SUNCOR ENERGY INC.  OIL SANDS  Suncor Energy Inc.   Coke Fired Boiler Replacement Project               Project Description Summary                  Submitted to:   The Canadian Environmental Assessment Agency       December 2017        Suncor Energy Inc. Coke Boiler Replacement Project December 2017 Page i Table of Contents  1  ...
1 alternate format found
French PDF
  • Relevance: 176.26
  •           SUNCOR ÉNERGIE INC.  SABLES BITUMINEUX  Suncor Énergie Inc.   Projet de remplacement de chaudières à coke  Résumé de la description du projet                  Soumis à :   l’Agence canadienne d’évaluation environnementale       Décembre 2017        Suncor Énergie Inc. Projet de remplacement de chaudières à coke Décembre 2017 Page i Table des matières  1  RENSEIGNEMENTS GÉNÉRAUX ...

Refine SearchDisplay Filters