Webequie Supply Road Project

Registry Search Mobile

Registry Search

Skip to Filters

432 results

Document Supporting Geospatial Data - Impact Statement

  • Project Webequie Supply Road Project
  • Document Category: Geospatial data files
  • Reference Number: 271
  • Document Date: 2026-03-13
  • Document: 165439E.html
  • Relevance: 397
  • Supporting Geospatial Data - Impact Statement Webequie First Nation has provided electronic geospatial files on February 27, 2026, related to the Webequie Supply Road Project. The dataset contains the following packages for maps provided in the Impact Statement. These data files are available to the public under the terms of the Open Government License – Canada. The geospatial data files are organized into packages corresponding to the relevant chapters and appendices of the Impact ...
1 alternate format found
French HTML
  • Relevance: 346
  • Données géospatiales connexes – étude d'impact (anglais seulement) La Première Nation de Webequie a fourni des fichiers électroniques de données géospatiales le 27 février 2026 liées au projet de route d'approvisionnement Webequie. L'ensemble de données contient les cartes fournies dans l'étude d'impact (anglais seulement). Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Les fichiers de données géospatiales sont ...

Document Impact Statement (updated April 14, 2026)

  • Project Webequie Supply Road Project
  • Document Category: Additional Information
  • Reference Number: 265
  • Document Date: 2026-01-30
  • Document: 166088E.html
  • Relevance: 392.47
  • Impact Statement (updated April 14, 2026) Notice to Reader (PDF – 112 KB) Master Table of Contents (PDF – 916 KB) Glossary of Terms.pdf (PDF – 170 KB) Acronyms List (PDF – 230 KB) Signature Page (PDF – 301 KB) Chapters Section 1 Introduction (PDF – 10 MB) Section 2 Engagement and Consultation Summary (PDF – 2 MB) Section 3 Evaluation of Project Alternatives (PDF – 22 MB) Section 4 Project Description (PDF – 8 MB) Section 5 Environmental Assessment/Impact Assessment Approach and ...
1 alternate format found
French HTML
  • Relevance: 341.47
  • Étude d'impact (anglais seulement — mise à jour le 14 avril 2026) Notice to Reader (PDF – 112 KB) Master Table of Contents (PDF – 916 KB) Glossary of Terms (PDF – 170 KB) Acronyms List (PDF – 230 KB) Signature Page (PDF – 301 KB) Chapitres Section 1 Introduction (PDF – 10 MB) Section 2 Engagement and Consultation Summary (PDF – 2 MB) Section 3 Evaluation of Project Alternatives (PDF – 22 MB) Section 4 Project Description (PDF – 8 MB) Section 5 Environmental Assessment/Impact ...

Document Consultation Progress Reports

  • Project Webequie Supply Road Project
  • Document Category: Additional Information
  • Reference Number: 269
  • Document Date: 2026-01-30
  • Document: 165316E.html
  • Relevance: 392.47
  • Consultation Progress Reports Round One Consultation Progress Report Round 1 for Aroland First Nation (PDF – 1.2 MB) Consultation Progress Report Round 1 for Attawapiskat First Nation (PDF – 1.3 MB) Consultation Progress Report Round 1 for Constance Lake First Nation (PDF – 1.3 MB) Consultation Progress Report Round 1 for Eabametoong First Nation (PDF – 1.2 MB) Consultation Progress Report Round 1 for Fort Albany First Nation (PDF – 1.3 MB) Consultation Progress Report Round 1 for ...
1 alternate format found
French HTML
  • Relevance: 341.47
  • Rapports sur l'avancement des consultations (anglais seulement) Premier cycle Consultation Progress Report Round 1 for Aroland First Nation (PDF – 1.2 MB) Consultation Progress Report Round 1 for Attawapiskat First Nation (PDF – 1.3 MB) Consultation Progress Report Round 1 for Constance Lake First Nation (PDF – 1.3 MB) Consultation Progress Report Round 1 for Eabametoong First Nation (PDF – 1.2 MB) Consultation Progress Report Round 1 for Fort Albany First Nation (PDF – ...

Document From the Impact Assessment Agency of Canada to Ontario Ministry of the Environment, Conservation and Parks re: Federal Provincial Co-operation on the Ongoing Ring of Fire Project Assessments under the Impact Assessment Act

  • Project Webequie Supply Road Project
  • Document Category: Additional Information
  • Reference Number: 264
  • Document Date: 2025-11-24
  • Document: 163943E.pdf
  • Relevance: 385.35
  • President Président 160 Elgin St., 22nd floor 160, rue Elgin, 22e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 Sarah Harrison Deputy Minister Ontario Ministry of the Environment, Conservation and Parks College Park, 5th Floor, 777 Bay Street Toronto ON M7A 2J3 Sarah.Harrison@ontario.ca Sarah Harrison: Subject: Federal Provincial Co-operation on the Ongoing Ring of Fire Project ...
1 alternate format found
French PDF
  • Relevance: 334.35
  • Président                               President 160, rue Elgin, 22e étage      160 Elgin St., 22nd floor Ottawa ON  K1A 0H3           Ottawa ON  K1A 0H3 Le 2424 novembre 2025 Envoyé par courriel Sarah Harrison Sous-ministre Ministère de l’Environnement, de la Protection de la nature et des Parcs  de l’Ontario College Park, 5e étage, 777 rue Bay Toronto ONON M7A 2J3 Sarah.Harrison@ontario.ca Madame Sarah Harrison ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Webequie Supply Road Project
  • Document Category: Additional Information
  • Reference Number: 259
  • Document Date: 2024-10-08
  • Document: 159271E.html
  • Relevance: 344.55
  • Notice of Transition to the Amended Impact Assessment Act Ottawa — October 8, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a step ...
1 alternate format found
French HTML
  • Relevance: 293.55
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée Ottawa — 8 octobre 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou l'Agence ...

Document Notice of Time Limit Extension

  • Project Webequie Supply Road Project
  • Document Category: Additional Information
  • Reference Number: 258
  • Document Date: 2024-10-08
  • Document: 159270E.html
  • Relevance: 344.55
  • October 8, 2024 — The Impact Assessment Agency of Canada is re-posting this Notice of Time Limit Extension with Reasons in accordance with the Notice of Transition. Notice of Time Limit Extension Ottawa — October 8, 2024 — On January 5, 2023, the Impact Assessment Agency of Canada (IAAC) granted an extension to the three-year time limit for Webequie First Nation (the proponent) to provide the required information or studies set out in the Notice of Commencement of the impact assessment ...
1 alternate format found
French HTML
  • Relevance: 293.55
  • 8 octobre 2024 – L'AEIC d'évaluation d'impact réaffiche cet avis de prolongation de délai avec motifs conformément à l'avis de transition. Avis de prolongation de délai Ottawa — 8 octobre 2024 — Le 5 janiver 2023, l'Agence d'évaluation d'impact du Canada (l'AEIC) a accordé une prolongation du délai de trois ans dont disposait la Première Nation de Webequie (le promoteur) pour fournir les études ou renseignements mentionnés dans l'avis de lancement de l'évaluation d'impact du projet de ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: