Shellburn Berthing Dolphin Replacement Project - PER No. 20-012-05 - Extension - Public comments invited

Registry Search Mobile

Registry Search

Skip to Filters

16 results

Document Notice of Determination

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: Additional Information
  • Reference Number: 8
  • Updated: 2023-03-03
  • Document: 146960E.html
  • Relevance: 358.23
  • Notice of Determination  Burnaby, B.C. – March 3, 2023 – The Vancouver Fraser Port Authority has determined that the proposed Shellburn Berthing Dolphin Replacement Project – PER No. 20-012-05 – Extension located on the south shore of Burrard Inlet in Burnaby, BC is not likely to cause significant adverse environmental effects This determination was based on a consideration of the following factors:  Impacts on rights of ...
1 alternate format found
French HTML
  • Relevance: 307.23
  • Avis de détermination  Burnaby, C.-B. – Le 3 mars 2023 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de remplacement des ducs-d'Albe de Shellburn Berthing – Prolongation du PER Nº 20-012-05, situés sur la rive sud de l'inlet Fraser à Burnaby (C.-B.), n'est pas susceptible d'entraîner des effets néfastes importants pour ...

Document Shellburn Berthing Dolphin Replacement Project - PER No. 20-012-05 - Extension - Public comments invited

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: For Public Participation
  • Reference Number: 7
  • Updated: 2022-12-20
  • Document: 145847E.html
  • Relevance: 351.22
  • Public notice  Shellburn Berthing Dolphin Replacement Project – PER No. 20-012-05 – Extension – Public comments invited  December 20, 2022 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Shellburn Berthing Dolphin Replacement Project – PER No. 20-012-05 – Extension, located on the south shore of Burrard Inlet in Burnaby, B.C., is likely to cause significant adverse environmental effects. Written comments to ...
1 alternate format found
French HTML
  • Relevance: 300.22
  • Avis public  Projet de remplacement des ducs-d'Albe de Shellburn Berthing – Prolongation du PER nº 20-012-05 – Le public est invité à formuler des commentaires  Le 20 décembre 2022 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition de projet de remplacement des ducs-d'Albe de Shellburn Berthing – Prolongation du PER Nº 20-012-05, situés sur la rive sud de l'inlet Fraser à Burnaby ...

Document Shellburn Berthing Dolphin Replacement Project - PER No. 20-012-02 - Extension to the Expiry Date

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: For Public Participation
  • Reference Number: 5
  • Updated: 2021-02-04
  • Document: 138024E.html
  • Relevance: 293.28
  • Public Notice Shellburn Berthing Dolphin Replacement Project – PER No. 20-012-02 – Extension to the Expiry Date – Public Comments Invited February 4, 2021 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed amendment to extend the validity period of the ...
1 alternate format found
French HTML
  • Relevance: 242.28
  • Avis public Projet de remplacement des ducs-d'Albe d'accostage de Shellburn – PER No 20-012-02 – Prolongement de la date d'expiration – Le public est invité à formuler des commentaires. Le 4 février 2021 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la modification proposée visant la prolongation de la date de validité du projet approuvé de remplacement des ducs-d'Albe d'accostage de Shellburn, ...

Document Shellburn Berthing Dolphin Replacement - Amendment PER No. 20-012-01 (Condition 23 - Extended Hours)

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: Additional Information
  • Reference Number: 4
  • Updated: 2021-01-12
  • Document: 137676E.html
  • Relevance: 291.57
  • Notice of Determination Burnaby, B.C. –January 12, 2021 – The Vancouver Fraser Port Authority has determined that the proposed Shellburn Berthing Dolphin Replacement Project – Amendment PER No. 20-012-01 (Condition 23 - Extended Hours) located at 201 Kensington Ave., Burnaby, B.C., not likely to cause significant adverse environmental ...
1 alternate format found
French HTML
  • Relevance: 240.57
  • Avis de détermination Burnaby, C.-B. – 12 janvier 2021 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de remplacement des ducs-d'Albe d'accostage de Shellburn – Modification au PER No 20-012-01 (Condition 23 – Heures prolongées), n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants :  Effets sur les droits des peuples autochtones  Connaissances ...

Document Shellburn Berthing Dolphin Replacement Project - Amendment PER No. 20-012-01 (Condition 23 - Extended Hours)

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: For Public Participation
  • Reference Number: 3
  • Updated: 2020-12-11
  • Document: 137173E.html
  • Relevance: 289.23
  • Public Notice Shellburn Berthing Dolphin Replacement Project – Amendment PER No. 20-012-01 (Condition 23 - Extended Hours) – Public Comments Invited December 11, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed amendment to construction hours in respect of condition 23 of the approved Shellburn Berthing Dolphin Replacement project, located in Burnaby, BC is likely to cause significant adverse ...
1 alternate format found
French HTML
  • Relevance: 238.23
  • Avis public Projet de remplacement des ducs-d'Albe d'accostage de Shellburn – Modification au PER No 20-012-01 (Condition 23 – Heures prolongées) – Le public est invité à formuler des commentaires. Le 11 décembre 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la modification proposée aux heures de construction concernant la condition 23 du projet de remplacement des ducs-d'Albe d'accostage ...

Document Shellburn Berthing Dolphin Replacement

  • Project Shellburn Berthing Dolphin Replacement
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-02-24
  • Document: 133972E.html
  • Relevance: 269.32
  • Shellburn Berthing Dolphin Replacement – Public Comments Invited February 24, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Shellburn Berthing Dolphin Replacement project, located in Burnaby, BC is likely to cause significant adverse environmental ...
1 alternate format found
French HTML
  • Relevance: 218.32
  • Remplacement des ducs-d'Albe d'accostage de Shellburn –  Le public est invité à formuler des commentaires. Le 24 février 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si le projet de remplacement des ducs-d'Albe ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: