Marina Construction Project

Registry Search Mobile

Registry Search

Skip to Filters

6 results

Document Public Comment Period on Intent to Make a Determination

  • Project Marina Construction Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-05-07
  • Document: 134168E.docx
  • Relevance: 274.3
  • Notice of intent to make a determination Marina Construction Project – Public Comments Invited March 16, 2020 – Indigenous Services Canada must determine whether the proposed Marina Construction Construction, located in Kebaowek is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. Written comments must be submitted by April 14, 2020 to: Mitcha Dubé ...
1 alternate format found
French DOCX
  • Relevance: 223.3
  • Avis public Construction d’une Marina – Période de consultation publique 16 Mars 2020 – Services aux Autochtones Canada doit déterminer si le projet proposé Construction d’une marina, situé à Kebaowek est susceptible d’entrainer des effets négatifs importants sur l’environnement. Les commentaires écrits peuvent être présentés d’ici le 14 avril 2020 à : Mitcha Dubé 320, rue St-Joseph Est, 3e étage Bureau 400 Québec, (Québec) G1K 9J2 mitcha.dube@canada.ca Le projet Le projet ...

Document Public Comment Period on Intent to Make a Determination

  • Project Marina Construction Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2020-05-07
  • Document: 134493E.docx
  • Relevance: 274.3
  • Notice of intent to make a determination Marina Construction Project – Public Comments Invited March 16, 2020 – Indigenous Services Canada must determine whether the proposed Marina Construction Construction, located in Kebaowek is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. Written comments must be submitted by April 14, 2020 to: Mitcha Dubé ...
1 alternate format found
French DOCX
  • Relevance: 223.3
  • Avis public Construction d’une Marina – Période de consultation publique 16 Mars 2020 – Services aux Autochtones Canada doit déterminer si le projet proposé Construction d’une marina, situé à Kebaowek est susceptible d’entrainer des effets négatifs importants sur l’environnement. Les commentaires écrits peuvent être présentés d’ici le 14 avril 2020 à : Mitcha Dubé 320, rue St-Joseph Est, 3e étage Bureau 400 Québec, (Québec) G1K 9J2 mitcha.dube@canada.ca Le projet Le projet ...

Document Marina Construction Project

  • Project Marina Construction Project
  • Document Category: Additional Information
  • Reference Number: 3
  • Updated: 2020-05-07
  • Document: 134758E.docx
  • Relevance: 274.3
  • Notice of determination May 7, 2020 – Indigenous Services Canada has determined that the proposed project “Marina Construction Project”: · Is not likely to cause significant adverse environmental effects The determination was based on a consideration of the following factors: · Mitigation measures are technically and economically feasible. The mitigation measures considered for this determination are as follows: · In-water work will take place in the spring of 2021, when the water level is low ...
1 alternate format found
French DOCX
  • Relevance: 223.3
  • Avis de détermination 7 mai 2020 – Services aux Autochtones Canada a déterminé que le projet « Projet de construction d’une marina ». · n’est pas susceptible de causer des effets négatifs importants sur l’environnement Cette détermination reposait sur les facteurs suivants: · Les mesures d’atténuation sont réalisables sur le plan technique et économique. Les mesures d’atténuation prises en compte pour cette détermination sont les suivantes: · Les travaux en eau auront lieu au printemps ...