Expansion of an iron ore storage area and extension of the railway

Registry Search Mobile

Registry Search

Skip to Filters

2 results

Document Notice of determination

  • Project Expansion of an iron ore storage area and extension of the railway
  • Document Category: Additional Information
  • Reference Number: 1
  • Updated: 2021-02-02
  • Document: 138396E.html
  • Relevance: 286.6
  • The Sept-Îles Port Authority has determined that the proposed expansion of an iron ore storage area and extension of the railway project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: •    impacts on rights of Indigenous peoples; •    Indigenous knowledge; •    community ...
1 alternate format found
French HTML
  • Relevance: 235.6
  • L'Administration portuaire de Sept-Îles (APSI) a déterminé que le projet de prolongement de la voie ferrée et d'agrandissement de l'aire d'entreposage de minerai de fer existante par la SFPPN, aux installations de Pointe-Noire, n'est pas susceptible de causer des effets environnementaux négatifs importants. Cette détermination repose sur les facteurs suivants : les répercussions sur les ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: