Document Retaining wall replacement

  • Project Retaining wall replacement
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-08-19
  • Document: 135830E.html
  • Relevance: 281.17
  • Notice of determination Retaining wall replacement   August 19, 2020 – The Vancouver Fraser Port Authority has determined that the proposed Retaining wall replacement, located at 220 Edworthy Way, New Westminster, B.C. is not likely to cause significant adverse environmental effects.  This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community knowledge Comments received from the ...
1 alternate format found
French HTML
  • Relevance: 230.17
  • Avis de détermination Remplacement du mur de retenue 19 août 2020 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet remplacement du mur de retenue, situé au 220 Edworthy Way, à New Westminster, C.-B. n'est pas susceptible d'entraîner des effets néfastes importants sur l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants :  Effets sur les droits des peuples autochtones  Connaissances autochtones  Connaissances ...

Document Retaining wall replacement

  • Project Retaining wall replacement
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-07-10
  • Document: 135348E.html
  • Relevance: 278.42
  • Public Notice Retaining wall replacement – Public Comments Invited July 10, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Retaining wall replacement, located at 220 Edworthy Way, New Westminster, BC is likely to cause significant adverse environmental effects. To help inform this determination and a decision on whether or not to approve the proposed project, the Vancouver Fraser Port Authority is ...
1 alternate format found
French HTML
  • Relevance: 227.42
  • Avis public Remplacement du mur de retenue – Le public est invité à formuler des commentaires. Le 10 juillet 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition de remplacement du mur de retenue, situé au 220 Edworthy Way à New Westminster, C.-B., est susceptible d'entraîner des effets néfastes importants pour l'environnement. Pour éclairer cette détermination ainsi que la ...

Refine SearchDisplay Filters