Document Logistics/Enhanced Recovery Vehicle and Combined Heavy Construction Equipment Replacement Facility, Garrison Petawawa
- Project Logistics/Enhanced Recovery Vehicle and Combined Heavy Construction Equipment Replacement Facility, Garrison Petawawa
- Document Category: For Public Participation
- Reference Number: 1
- Updated: 2020-07-29
- Document: 135622E.html
- Relevance: 281.18
- Public Comment Period on Intent to Make a Determination July 29, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy ...
1 alternate format found
French HTML
- Relevance: 230.18
- Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Installation de maintenance mixte pour la modernisation des véhicules logistiques et des véhicules de récupération améliorée et le remplacement de l'équipement lourd commun, Garnison Petawawa le 29 juillet 2020 — ; Ministère de la Défense nationale doit déterminer si le projet proposée est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de ...