Document Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
- Project Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2020-11-09
- Document: 137465E.html
- Relevance: 317.47
- Notice of determination Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080) November 9, 2020 – The Vancouver Fraser Port Authority has determined that the proposed amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080), located at Area IV – Richmond Logistics Hub, west of No. 7 Road Canal, Richmond is not likely to cause significant adverse environmental ...
1 alternate format found
French HTML
- Relevance: 266.47
- Avis de détermination Modification aux heures de construction concernant la condition 18 pour la préparation du site approuvée dans la zone IV (PER No 17-080) 6 novembre 2020 – L'Administration portuaire Vancouver-Fraser a déterminé que la modification proposée aux heures de construction en vertu de la condition 18 pour la préparation du site approuvée dans la zone IV (PER No. 17-080), située à Richmond Logistics Hub, à l'ouest du canal routier No 7 à Richmond, n'est pas susceptible ...