Culvert Replacement- Taxiway Golf, 8 Wing Trenton

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Culvert Replacement- Taxiway Golf, 8 Wing Trenton
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2021-08-19
  • Document: 141078E.html
  • Relevance: 308.44
  • Notice of Determination August  19, 2021 –8 Wing Trenton The Department of National Defence has determined that the proposed ‘Culvert Replacement' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause significant adverse ...
1 alternate format found
French HTML
  • Relevance: 257.44
  • Avis de détermination Le 19 août 2021 –8e Escadre Trenton Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Remplacement de ponceau' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale est convaincu que le projet est peu susceptible de causer des ...

Document Public Comment Period on Intent to Make a Determination

  • Project Culvert Replacement- Taxiway Golf, 8 Wing Trenton
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-07-19
  • Document: 140688E.html
  • Relevance: 305.96
  • Public Comment Period on Intent to Make a Determination Culvert Replacement– Taxiway Golf, 8 Wing Trenton July 19, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, ...
1 alternate format found
French HTML
  • Relevance: 254.96
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Remplacement de ponceau - voie de circulation Golf, 8e Escadre Trenton Le 19 juillet 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: