Upper Beaver Gold Project

Registry Search Mobile

Registry Search

Skip to Filters

206 results

Document Tailored Impact Statement Guidelines

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 83
  • Updated: 2022-04-20
  • Document: 143580E.pdf
  • Relevance: 388.46
  • Upper Beaver Gold Project TAILORE D IMPACT STATEMENT GUIDELINES PURSUANT TO THE IMPACT ASSESSME NT ACT APRIL 20, 2022 IMPACT ASSESSMENT AGENCY OF CANADA T AILORED IMPACT STATEMENT GUIDELINES – UPPER BEAVER GOLD PROJECT ii Contents Abbreviations and Short Forms ........................................................................................ vi 1. ...
1 alternate format found
French PDF
  • Relevance: 337.46
  • Projet aurifère Upper Beaver LIGNES DIRECTRICES INDIVIDUA LISÉES RELATIVES À L’ÉTUDE D’IMPACT EN VERTU DE LA LOI SUR L’ÉVALUATION D’IMPACT 20 AVRIL 2022 AGENCE D’ÉVALUATION D’IMPACT DU CANADA LIGNES DIRECTRICES IN DIVIDUALISÉES – PROJET AURIFÈRE UPPER BEAVER ii Table des matières Abréviations et formes abrégées .................................................................................... VIII 1. ...

Document Cooperation Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 84
  • Updated: 2022-04-20
  • Document: 143581E.pdf
  • Relevance: 388.46
  • Cooperation Plan UPPER BEAVER GOLD PROJECT April 20, 2022 IMPACT ASSESSMENT AG ENCY OF CANADA UPPER BEAVER GOLD PROEJCT - COOPERATION PLAN 2 Table of Contents 1. Introduction .......................................................................................1 2. Description of the proposed Project ..................................................1 3. Approach to cooperation ...
1 alternate format found
French PDF
  • Relevance: 337.46
  • Plan de collaboration PROJET AURIFÈRE UPPER BEAVER 20 avril 2022 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE COLLABORATIO N 2 Table des matières 1. Introduction .......................................................................................1 2. Description du projet proposé ...........................................................1 3. Approche de collaboration ...

Document Notice of Commencement

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 88
  • Updated: 2022-04-20
  • Document: 143619E.html
  • Relevance: 388.46
  • Notice of Commencement of an Impact Assessment Ottawa — April 20, 2022 — The Impact Assessment Agency of Canada (the Agency) has commenced an impact assessment pursuant to the Impact Assessment Act for the Upper Beaver Gold Project. On December 16, 2021, the Agency decided that a federal impact assessment was required and posted the Notice of Impact Assessment Decision with Reasons on December 20, 2021. The Agency has issued the following documents to the proponent to guide the ...
1 alternate format found
French HTML
  • Relevance: 337.46
  • Avis de lancement d'une évaluation d'impact Ottawa — 20 avril 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) a débuté une évaluation d'impact en vertu de la Loi sur l'évaluation d'impact pour le projet aurifère Upper Beaver. L'Agence a décidé, le 16 décembre 2021, qu'une évaluation d'impact fédérale était requise, et a affiché l'avis de décision d'évaluation d'impact assortie de motifs le 20 décembre 2021. L'Agence a fourni les documents suivants au promoteur pour guider la ...

Document Indigenous Engagement and Partnership Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 87
  • Updated: 2022-04-20
  • Document: 143584E.pdf
  • Relevance: 388.46
  • Indigenous Engagement and Partnership Plan IMPACT ASSESSMENT OF THE UPPER BEAVER GOLD PROJECT April 20, 2022 IMPACT ASSESSMENT AG ENCY OF CANADA INDIGENOUS ENGAGEMENT AND PARTNERSHIP PL AN 2 Table of Contents 1. Introduction ..................................................................................................... 3 2. Description of the proposed Project ................................................................ 3 3. ...
1 alternate format found
French PDF
  • Relevance: 337.46
  • Plan de mobilisation et de partenariat avec les Autochtones ÉVALUATION D’IMPACT DU PROJET AURIFÈRE UPPER BEAVER 20 avril 2022 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE MOBIL ISATION ET DE PARTENARIAT AVEC LES AUTOCHTONES 2 Table des matières 1. Introduction ..................................................................................................... 3 2. Description du projet proposé ...

Document Permitting Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 86
  • Updated: 2022-04-20
  • Document: 143583E.pdf
  • Relevance: 388.46
  • IM PACT ASSESSM ENT AGENCY OF CANADA UPPER BEAVER GOLD PR OJECT 1 Permitting Plan UPPER BEAVER GOLD PROJECT April 20, 2022 Table of Contents 1. Introduction ............................................................................................................... 3 2. Project Description ................................................................................................... 3 3. Required Regulatory ...
1 alternate format found
French PDF
  • Relevance: 337.46
  • Plan de délivrance de permis PROJET AURIFÈRE UPPER BEAVER 20 avril 2022 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PROJET AURIFÈRE UPPER BEAVER i Table des matières 1. Introduction ......................................................................................................... 2 2. Description du projet ........................................................................................... 2 3. Détermination et ...

Document Draft Permitting Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 60
  • Updated: 2022-01-31
  • Document: 142687E.pdf
  • Relevance: 380.17
  • Permitting Plan UPPER BEAVER GOLD PROJECT January 31, 2022 DRAFT VERSION IM PACT ASSESSM ENT AGENCY OF CANADA UPPER BEAVER GOLD PR OJECT i Table of Contents Permitting Plan............................................................................................................... 1 1. Introduction ............................................................................................................... 2 2. Project ...
1 alternate format found
French PDF
  • Relevance: 329.17
  • Plan de délivrance de permis PROJET AURIFÈRE UPPER BEAVER 31 janvier 2022 AGENCE D’ÉVALUATION D’ IM PACT DU CANADA PROJET AURIFÈRE UPPER BEAVER i Table des matières Plan de délivrance de permis...................................................................................... 1 1. Introduction ............................................................................................................... 2 2. ...

Document Public Notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and the Draft Public Participation Plan

  • Project Upper Beaver Gold Project
  • Document Category: For Public Participation
  • Reference Number: 56
  • Updated: 2022-01-31
  • Document: 142682E.html
  • Relevance: 380.17
  • Public Notice Upper Beaver Gold Project — Comment Period on the Draft Tailored Impact Statement Guidelines and Draft Public Participation Plan What is happening? January 31, 2022 — The Impact Assessment Agency of Canada (the Agency) is conducting an impact assessment for the proposed Upper Beaver Gold Project, located 20 kilometres northeast of Kirkland Lake, Ontario. As part of the planning phase in the impact assessment process, the Agency invites the public and Indigenous groups to ...
1 alternate format found
French HTML
  • Relevance: 329.17
  • Avis public Projet aurifère Upper Beaver — Période de consultation publique sur la version provisoire des lignes directrices individualisées relatives à l'étude d'impact et la version provisoire du plan de participation du public Que se passe-t-il? Le 31 janvier 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) réalise une évaluation d'impact pour le projet aurifère Upper Beaver, situé à 20 kilomètres au nord-est de Kirkland Lake, en Ontario. Dans le cadre de l'étape ...

Document Draft Tailored Impact Statement Guidelines

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 57
  • Updated: 2022-01-31
  • Document: 142684E.pdf
  • Relevance: 380.17
  • IM PACT ASSESSM ENT AGENCY OF CANADA Tailored Impact Statement Guidelines IMPACT ASSESSMENT OF THE UPPER BEAVER GOLD PROJECT JANUARY 31, 2022 DRAFT VERSION IM PACT ASSESSM ENT AGENCY OF CANADA TAILORED IMPACT STAT EMENT GUIDELINES i Contents Abbreviations and Short Forms ............................................................................................. 1 ...
1 alternate format found
French PDF
  • Relevance: 329.17
  • AGENCE D’ÉVALUATION D’ IM PACT DU CANADA Lignes directrices individualisées relatives à l’étude d’impact ÉVALUATION D’IMPACT DU PROJET AURIFÈRE UPPER BEAVER 31 JANVIER 2022 VERSION PROVISOIRE AGENCE D’ÉVALUATION D’ IM PACT DU CANADA LIGNES DIRECTRICES INDIVIDUALISÉES RELAT IVES À L’ÉT UDE D’IMPACT i Table des matières Abréviations et formes abrégées ...

Document Draft Cooperation Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 59
  • Updated: 2022-01-31
  • Document: 142686E.pdf
  • Relevance: 380.17
  • Cooperation Plan UPPER BEAVER GOLD PROJECT January 31, 2022 DRAFT VERSION IM PACT ASSESSM ENT AGENCY OF CANADA UPPER BEAVER GOLD PR OJECT – DRAFT COOPERATION PLAN 1 1. Introduction On December 16, 2021, the Impact Assessment Agency of Canada (the Agency) decided that an impact assessment is required for the Upper Beaver Gold Project (the Project), pursuant to subsection 16(1) of Canada’s Impact Assessment Act. A Class Environmental ...
1 alternate format found
French PDF
  • Relevance: 329.17
  • Plan de collaboration PROJET AURIFÈRE UPPER BEAVER 31 JANVIER 2022 VERSION PROVISOIRE AGENCE D’ÉVALUATION D’ IM PACT DU CANADA PROJET AURIFÈRE UPPER BEAVER – PLAN DE COLLABORATION 1 1. Introduction Le 16 décembre 2021, l’Agence d’évaluation d’impact du Canada (l’Agence) a décidé que le projet aurifère Upper Beaver (le projet) serait soumis à une évaluation d’impact en vertu du paragraphe 16(1) de la Loi sur l’évaluation ...

Document Draft Indigenous Engagement and Participation Plan

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 61
  • Updated: 2022-01-31
  • Document: 142688E.pdf
  • Relevance: 380.17
  • Indigenous Engagement and Partnership Plan IMPACT ASSESSMENT OF THE UPPER BEAVER GOLD PROJECT January 31, 2022 DRAFT VERSION IMPACT ASSESSMENT AGENCY OF CANADA IN DIGENOUS ENGAGEM ENT AND PART NERSHIP PLAN – DRAFT VERSION 2 Contents Indigenous Engagement and Partnership Plan ................................................ 1 1. Introduction ...
1 alternate format found
French PDF
  • Relevance: 329.17
  • Plan de mobilisation et de partenariat avec les Autochtones ÉVALUATION D’IMPACT DU PROJET AURIFÈRE UPPER BEAVER 31 janvier 2022 VERSION PROVISOIRE AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PL AN DE MOBIL ISATION ET DE PARTENARIAT AVEC LES AUT OCHTONES – VERSION PROVISOIRE 2 Table des matières Version provisoire du Plan de mobilisation et de partenariat avec les Autochtones ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 55
  • Updated: 2021-12-20
  • Document: 142411E.html
  • Relevance: 375.84
  • Notice of Impact Assessment Decision with Reasons Ottawa — December 20, 2021 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is required for the Upper Beaver Gold Project (the Project) proposed by Agnico Eagle Mines Limited (the Proponent) located in Ontario. In accordance subsection 16(2) of the Impact Assessment Act (IAA), the Agency has taken into account each of the following factors: the Proponent's Detailed Project Description, and its ...
1 alternate format found
French HTML
  • Relevance: 324.84
  • Avis de décision d'évaluation d'impact assortie de motifs Ottawa — 20 décembre 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) a déterminé qu'une évaluation d'impact est requise pour le projet aurifère Upper Beaver (le Projet) situé en Ontario. En vertu du paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte chacun des éléments suivants : la description détaillée du projet du promoteur, et sa réponse au sommaire des enjeux. L'Agence est ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 53
  • Updated: 2021-12-16
  • Document: 142394E.pdf
  • Relevance: 375.43
  • UPPER BEAVER GOLD PROJECT DETAILED PROJECT DESCRIPTION PLAIN LANGUAGE SUMMARY December 2021 Upper Beaver Gold project Detailed Project Description Plain Language Summary Page S-i TABLE OF CONTENTS PAGE A. INTRODUCTION AND GENERAL INFORMATION ......................................................................... 1 A.1 Project Name, Sector and Location ...
1 alternate format found
French PDF
  • Relevance: 324.43
  • PROJET AURIFÈRE UPPER BEAVER DESCRIPTION DÉTAILLÉE DU PROJET RÉSUMÉ Décembre 2021 Projet aurifère Upper Beaver Description détaillée du projet Résumé Page R -i TABLE DES MATIÈRES PAGE A. INTRODUCTION ET RENSEIGNEMENTS GÉNÉRAUX ................................................................... 1 A.1 Nom, secteur et emplacement du projet ...

Document Notice of Time Limit Resuming

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 51
  • Updated: 2021-12-06
  • Document: 142410E.html
  • Relevance: 374.41
  • Notice of Time Limit Resuming Ottawa — December 8, 2021 — On December 6, 2021, Agnico Eagle Mines Limited (the proponent) provided its response to the Summary of Issues and Detailed Project Description for the Upper Beaver Gold Project to the Impact Assessment Agency of Canada (the Agency). The proponent thereby completed the activity for which the time limit suspension was requested on October 28, 2021, and the 180-day time limit has resumed as of December 6, 2021. The 180-day time limit ...
1 alternate format found
French HTML
  • Relevance: 323.41
  • Avis de reprise du délai Ottawa — 8 décembre 2021 — Le 6 décembre 2021, Agnico Eagle Mines Limited (le promoteur) a fourni sa réponse au sommaire des enjeux et une description de projet détaillée pour le projet aurifère Upper Beaver à l'Agence d'évaluation d'impact du Canada (l'Agence). Le promoteur a ainsi terminé l'activité pour laquelle la suspension du délai a été demandé (en anglais seulement) le 28 octobre 2021, et le délai de 180 jours a repris son cours à compter du 6 ...

Document Notice of Time Limit Suspension with Reasons

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 47
  • Updated: 2021-11-03
  • Document: 141730E.html
  • Relevance: 371.06
  • Notice of Time Limit Suspension with Reasons Ottawa — November 3, 2021 — On October 28, 2021, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for Agnico Eagle Mines Limited's (the Proponent) Upper Beaver Gold Project. The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to provide the ...
1 alternate format found
French HTML
  • Relevance: 320.06
  • Avis de suspension du délai avec motifs Ottawa — Le 3 novembre 2021 — Le 28 octobre 2021, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours prévu pour la phase de planification, en vertu de la Loi sur l'évaluation d'impact, pour le projet aurifère Upper Beaver de Mines Agnico Eagle Limitée (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (en anglais seulement) visant à suspendre le délai, afin de sortir qu'il ait ...

Document Summary of Issues

  • Project Upper Beaver Gold Project
  • Document Category: Additional Information
  • Reference Number: 31
  • Updated: 2021-10-22
  • Document: 141644E.pdf
  • Relevance: 369.85
  • Upper Beaver Gold Project – Summary of Issues This document provides a high-level summary of the issues submitted to the Impact Assessment Agency of Canada (the Agency) on the Upper Beaver Gold Project (the Project) during the comment period on the Initial Project Description submitted by Agnico Eagle Mines Ltd. (the Proponent). The issues highlight information needs to support the Agency’s decision on whether an impact assessment is required under section 16 of the ...
1 alternate format found
French PDF
  • Relevance: 318.85
  • Projet aurifère Upper Beaver – Résumé des Enjeux Le présent document fournit un sommaire global des enjeux soulevées auprès de l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet aurifère Upper Beaver (le projet) pendant la période de consultation publique portant sur la Description initiale du projet, soumise par Agnico Eagle Mines Ltd. (le promoteur). Les enjeux soulevés mettent en évidence les besoins en matière d’information pour appuyer la décision ...

Document Public Notice - Public Comments Invited on a Summary of the Initial Project Description

  • Project Upper Beaver Gold Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2021-09-13
  • Document: 141287E.html
  • Relevance: 365.95
  • Public Notice Upper Beaver Gold Project — Public Participation Opportunities and Funding Availability What is happening? September 13, 2021 — The Impact Assessment Agency of Canada (the Agency) has accepted the initial project description for the proposed Upper Beaver Gold Project, an underground and open-pit gold/copper mine located 20 kilometres northeast of Kirkland Lake, Ontario. The Agency invites the public and Indigenous groups to review the summary of the initial project ...
1 alternate format found
French HTML
  • Relevance: 314.95
  • Avis Public Projet aurifère Upper Beaver — Période de consultation publique et disponibilité d'une aide financière Que se passe-t-il? Le 13 septembre 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) a accepté une description initiale de projet pour le projet aurifère Upper Beaver, une mine d'or et de cuivre souterraine et à ciel ouvert située à 20 kilomètres au nord-est de Kirkland Lake, en Ontario. L'Agence invite le public et les groupes autochtones à examiner le résumé de ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Upper Beaver Gold Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-09-09
  • Document: 141179E.pdf
  • Relevance: 365.55
  • UPPER BEAVER GOLD PROJECT INITIAL PROJECT DESCRIPTION PART F: PLAIN LANGUAGE SUMMARY August 2021 Upper Beaver Gold project Initial Project Description Part F: Plain Language Summary Page S-i TABLE OF CONTENTS PAGE 1. INTRODUCTION ................................................................................................................................ 1 2. GENERAL INFORMATION ...
1 alternate format found
French PDF
  • Relevance: 314.55
  • PROJET AURIFÈRE UPPER BEAVER DESCRIPTION INITIALE DU PROJET PARTIE F : RÉSUMÉ Août 2021 Projet aurifère Upper Beaver Description initiale du projet Partie F : Résumé Page R -i TABLE DES MATIÈRES PAGE 1. INTRODUCTION .............................................................................................................................. 1 2. RENSEIGNEMENTS GÉNÉRAUX ...

Comment Upper Beaver - 82960 - comments to the TISG and PPP

  • Comment Upper Beaver Gold Project
  • Author: Administrator on behalf of Maria Lelie
  • Reference Number: 99
  • Submitted: 2022-03-21
  • Project Phase: Planning
  • Participation Notice: Public Notice - Public Comments Invited on the Draft Tailored Impact Statement Guidelines and the Draft Public Participation Plan
  • Relevance: 284.29
  • Please see the attached submission. 
  • Attachment Included
  • Relevance: 284.29
  • UPPER BEAVER GOLD PROJECT Baseline Studies Overview as of October 1, 2021. TABLE OF CONTENT Baseline Studies Overview 3 Physical Environment Baselines 5 Air Quality 6 Noise 6 Hydrology and Climate 7 Hydrogeology 9 Geochemistry and Geology ...
  • Attachment Included
  • Relevance: 284.29
  • 1 March 12, 2022 Impact Assessment Agency of Canada 55 York Street, 6th Floor Toronto, ON M5J 1R7 By email: UpperBeaver@iaac-aeic.gc.ca Re: Agnico Eagle Upper Beaver Project - TISG and PPP - IAAC Reference ...
  • Attachment Included
  • Relevance: 284.29
  • PROJECT UPDATE TO COTTAGERS AND SURFACE RIGHT OWNERS Agnico Eagle – Kirkland Lake Properties December 3, 2020 The information in this presentation has been prepared as of November 2020. Certain statements contained in this presentation ...
  • Attachment Included
  • Relevance: 284.29
  • Project Update to Indigenous Community Partners Kirkland Lake Project May, 2018 • AEM overview • AEM Acquisition • Kirkland Lake Project – project update • Exploration Activities • Environmental and Rehabilitation work • Upcoming plan ...
  • Attachment Included
  • Relevance: 284.29
  • 1 October 4, 2021 Impact Assessment Agency of Canada 55 York Street, 6th Floor Toronto, ON M5J 1R7 By email: UpperBeaver@iaac-aeic.gc.ca Re: Agnico Eagle Upper Beaver Project Initial Project Description IAAC Reference ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Date modified: