25 kV Electrical Network Protection Increase

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project 25 kV Electrical Network Protection Increase
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-02-02
  • Document: 142743E.html
  • Relevance: 322.29
  • Notice of Determination February 2, 2022 – 3 Wing Canadian Forces Base Bagotville The Department of National Defence has determined that the proposed ‘25 kV Electrical Network Protection Increase' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measure The Department of National Defence is satisfied that that the carrying out of the ...
1 alternate format found
French HTML
  • Relevance: 271.29
  • Avis de détermination Le 2 février 2022 – 3 Escadre de la Base des Forces canadiennes Bagotville Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Augmentation protection réseau 25kV' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le ...

Document Public Comment Period on Intent to Make a Determination

  • Project 25 kV Electrical Network Protection Increase
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-12-21
  • Document: 142444E.html
  • Relevance: 318.64
  • Public Comment Period on Intent to Make a Determination 25 kV Electrical Network Protection Increase December 21, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, ...
1 alternate format found
French HTML
  • Relevance: 267.64
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Augmentation protection réseau 25kV Le 21  décembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette détermination. Tous les commentaires reçus ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: