Breakwater Reconstruction, Wedge Point, Yarmouth, NS

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Breakwater Reconstruction, Wedge Point, Yarmouth, NS
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-05-25
  • Document: 147754E.html
  • Relevance: 359.28
  • Notice of Determination May 25, 2023 - The Federal Authorities have issued their Notice of Determination after evaluation of the project Breakwater Reconstruction, Wedge Point, Yarmouth County, NS and have determined that the project is not likely to cause significant adverse environmental effects with mitigation measures as outlined in their evaluation and can therefore proceed.
1 alternate format found
French HTML
  • Relevance: 308.28
  • Avis de décision 25 mai 2023 - autorités fédérales ont publié un avis de décision après l'évaluation du projet Reconstruction du Bris-Lames, Wedge Point, comté Yarmouth, N.-É. et ont déterminé que le projet n'est pas susceptible d'avoir des effets environnementaux négatifs importants en suivant les mesures d'atténuation décrites dans leur ...

Document End of Public Comment Period

  • Project Breakwater Reconstruction, Wedge Point, Yarmouth, NS
  • Document Category: Additional Information
  • Reference Number: 1
  • Updated: 2023-05-13
  • Document: 147740E.html
  • Relevance: 358.12
  • End of Public Comment Period May 13, 2022– The public comment period on the project is closed. Fisheries and Oceans Canada - Small Craft Harbours is considering comments received to date to inform its determination on whether carrying out of the project is likely to cause significant adverse environmental effects.
1 alternate format found
French HTML
  • Relevance: 307.12
  • Fin de la période de consultation publique 13 mai 2022 - La période de commentaires du public sur le projet est maintenant terminée. Pêches et Océans Canada - Ports pour petits bateaux examine les commentaires reçus à ce jour afin de déterminer si l'exécution du projet est susceptible d'entraîner des effets environnementaux négatifs importants.

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: