Campus Energy - Pipeline Replacement/Removal

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Campus Energy - Pipeline Replacement/Removal
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-10-31
  • Document: 145384E.html
  • Relevance: 345.93
  • Notice of Determination October 31, 2022 The Department of National Defence has determined that the proposed ‘Campus Energy - Pipeline Replacement/Removal' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
  • Relevance: 294.93
  • Avis de détermination Le 31 octobre 2022 Le Ministère de la Défense nationale à déterminé que le projet proposé ‘Campus Energy - Remplacement/Retrait de pipeline' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : mesures d'atténuation réalisables sur les plans technique et économique. Le Ministère de la Défense nationale est convaincu que le projet est peu susceptible de causer des effets ...

Document Public Comment Period on Intent to Make a Determination

  • Project Campus Energy - Pipeline Replacement/Removal
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-09-21
  • Document: 145135E.html
  • Relevance: 342.22
  • Public Comment Period on Intent to Make a Determination Campus Energy - Pipeline Replacement/Removal September 21, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, ...
1 alternate format found
French HTML
  • Relevance: 291.22
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Campus Energy - Remplacement/Retrait de pipeline Le 21 septembre 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette détermination. Tous les ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: