Installation of Fire Suppression Infrastructure at Rideau Hall

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Installation of Fire Suppression Infrastructure at Rideau Hall
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-08-29
  • Document: 152881E.html
  • Relevance: 376.08
  • Notice of Determination [Ottawa, Ontario] – [August 29, 2023] – The National Capital Commission has determined that the proposed project is not likely to cause significant adverse environmental effects with the application of all recommended mitigation measures. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures; and, the components of the environment that are within the legislative authority of Parliament ...
1 alternate format found
French HTML
  • Relevance: 325.08
  • Avis de décision [Ottawa, Ontario] – [Le 29 août 2023] – La Commission de la capitale nationale a déterminé que le projet proposé n'est pas susceptible de causer des effets environnementaux négatifs importants si toutes les mesures d'atténuation recommandés sont mise en oeuvre. Cette détermination reposait sur les facteurs suivants : mesures d'atténuation réalisables sur les plans technique et économique; et, composantes de l'environnement qui relèvent de la compétence législative du ...

Document Installation of Fire Suppression Infrastructure at Rideau Hall

  • Project Installation of Fire Suppression Infrastructure at Rideau Hall
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-03-28
  • Document: 147110E.html
  • Relevance: 360.65
  • Public Notice Installation of Fire Suppression Infrastructure at Rideau Hall – Public Comments Invited March 28, 2023 – The National Capital Commission must determine whether the installation of Fire Suppression Infrastructure at Rideau Hall is likely to cause significant adverse environmental effects in compliance with sections 81-91 of the Impact Assessment Act and the National Capital Act. To help inform this determination, the National Capital Commission is inviting comments from the ...
1 alternate format found
French HTML
  • Relevance: 309.65
  • Avis public Installation d'une infrastructure d'extinction des incendies à Rideau Hall – Période de consultation publique Le 28 mars 2023 – La Commission de la capitale nationale doit déterminer si le projet proposé Installation d'une infrastructure d'extinction des incendies à Rideau Hall est susceptible d'entraîner des effets négatifs importants sur l'environnement en vertu des articles 81 à 91 de la Loi sur l'Évaluation d'impact et de la Loi sur la capitale nationale Afin de contribuer ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: