Installation of no anchor sign

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Installation of no anchor sign

  • Project Installation of no anchor sign
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2024-03-27
  • Document: 160199E.html
  • Relevance: 325.95
  • Notice of Determination Surrey, B.C. –March 27, 2024– The Vancouver Fraser Port Authority has determined that the proposed Installation of no anchor sign located at approximately 500 metres downstream of the Port Mann Bridge on the south shore of the Fraser River is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community ...
1 alternate format found
French HTML
  • Relevance: 274.95
  • Avis de détermination Surrey C.-B. – 27 mars 2024 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de installation d'un panneau interdisant le mouillage située à environ 500 mètres en aval du pont de Port Mann sur la rive sud du fleuve Fraser n'est pas susceptible d'avoir des effets négatifs importants sur l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : • Effets sur les droits des peuples autochtones • Connaissances ...

Document Installation of no anchor sign

  • Project Installation of no anchor sign
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2023-08-22
  • Document: 152945E.html
  • Relevance: 307.78
  • Public notice Installation of no anchor sign – Public comments invited August 22, 2023 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Installation of no anchor sign, located approximately 500 metres downstream of the Port Mann Bridge on the south shore of the Fraser River in Surrey, BC, is likely to cause significant adverse environmental effects. To help inform this determination and a decision on whether ...
1 alternate format found
French HTML
  • Relevance: 256.78
  • Avis public Installation d'un panneau interdisant le mouillage – Le public est invité à formuler des commentaires. Le 22 août 2023 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si le projet d'installation d'un panneau interdisant le mouillage, situé à environ 500 mètres en aval du pont Port Mann sur la rive sud du fleuve Fraser à Surrey (C.-B.), est susceptible d'entraîner des effets ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: