Construction of Three Free Standing Cell Towers at Albert Head, Canadian Forces Base Esquimalt

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction of Three Free Standing Cell Towers at Albert Head, Canadian Forces Base Esquimalt
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-07-30
  • Document: 162582E.html
  • Relevance: 369.25
  • Notice of Determination July 30, 2025 The authorities have determined that the proposed ‘Construction of Three Free Standing Cell Towers at Albert Head, Canadian Forces Base Esquimalt' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically ...
1 alternate format found
French HTML
  • Relevance: 318.25
  • Avis de détermination Le 30 juillet 2025 Les autorités ont déterminé que le projet proposé ‘Construction de trois pylônes de transmission cellulaire autoportants à Albert Head - Base des Forces canadiennes Esquimalt' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction of Three Free Standing Cell Towers at Albert Head, Canadian Forces Base Esquimalt
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-03-22
  • Document: 156034E.html
  • Relevance: 323.18
  • Public Comment Period on Intent to Make a Determination Construction of Three Free Standing Cell Towers at Albert Head, Canadian Forces Base Esquimalt March 22, 2024 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received ...
1 alternate format found
French HTML
  • Relevance: 272.18
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction de trois pylônes de transmission cellulaire autoportants à Albert Head - Base des Forces canadiennes Esquimalt Le 22 mars 2024 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à ...