Document Public Comment Period on Intent to Make a Determination
- Project Design and Construction of Advanced Water Supply System (AWSS) Infrastructure - 5th Canadian Division Support Base (CDSB) Gagetown
- Document Category: For Public Participation
- Reference Number: 1
- Document Date: 2025-06-04
- Document: 161833E.html
- Relevance: 366.38
- Public Comment Period on Intent to Make a Determination Design and Construction of Advanced Water Supply System (AWSS) Infrastructure - 5th Canadian Division Support Base (CDSB) Gagetown June 4, 2025 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the ...
1 alternate format found
French HTML
- Relevance: 315.38
- Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Conception et construction d'une infrastructure avancée de système d'approvisionnement en eau - Base de soutien de la 5e Division du Canada Gagetown Le 4 juin 2025 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense ...