Modification of Hydro-Québec facilities, including the construction of a new sectioning post to optimize and integrate energy produced by a forest biomass cogeneration plant in Opitciwan

Registry Search Mobile

Registry Search

Skip to Filters

2 results

Document Notice of Determination- Housing, Infrastructure and Communities Canada and Indigenous Services Canada

  • Project Modification of Hydro-Québec facilities, including the construction of a new sectioning post to optimize and integrate energy produced by a forest biomass cogeneration plant in Opitciwan
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-09-15
  • Document: 163217E.html
  • Relevance: 378.03
  • Notice of Determination Ottawa (ON), Québec (QC)– September 15, 2025 – Housing, Infrastructure and Communities Canada and Indigenous Services Canada have determined that the project to Modify Hydro-Québec's facilities, including the construction of a new sectioning substation to optimize and integrate energy produced from a cogeneration plant with forest biomass in Opitciwan (Obedjiwan), is not likely to cause significant adverse effects on the environment. This determination was based on a ...
1 alternate format found
French HTML
  • Relevance: 327.03
  • Avis de détermination Ottawa (ON), Québec (QC) – 15 septembre 2025 – Logement, infrastructures et Collectivités Canada et Services aux Autochtones Canada ont déterminé que le projet de Modification des installations d'Hydro-Québec incluant la construction d'un nouveau poste de sectionnement pour optimiser et intégrer de l'énergie produite à partir d'une centrale de cogénération à la biomasse forestière à Opitciwan (Obedjiwan) n'est pas susceptible de causer des effets négatifs importants sur ...