Document Notice of Determination
- Project Strategic Tanker Transport Capability Project Support Infrastructure – Phase 2: Construction of a 3rd Hangar Bay and Aircraft Fueling and Defueling Infrastructure – 8 Wing Trenton
- Document Category: Additional Information
- Reference Number: 2
- Document Date: 2026-03-04
- Document: 165310E.html
- Relevance: 394.68
- Notice of Determination March 4, 2026 The authorities have determined that the proposed ‘Strategic Tanker Transport Capability Project Support Infrastructure at CFB Trenton – Phase 2, Construction of a 3rd Hangar Bay and Aircraft Fueling and Defueling Infrastructure' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous ...
1 alternate format found
French HTML
- Relevance: 343.68
- Avis de détermination Le 4 mars 2026 Les autorités ont déterminé que le projet proposé ‘Infrastructure de soutien du projet Avion stratégique de transport et de ravitaillement en vol – Phase 2 : Construction d'un troisième hangar et d'une infrastructure de ravitaillement et de reprise de carburant – 8e Escadre Trenton' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les ...