Pacific Future Energy Refinery Project

Comment Search Mobile

Comment Search

Skip to filters

96 results

Attachment From Douglas Channel Watch to the Canadian Environmental Assessment Agency re: Pacific Future Energy Refinery Project, Addendum to the Project Description - Activities that are Incidental to the Pacific

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 78
  • Submitted: 2016-12-15
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Douglas Channel Watch to the Canadian Environmental Assessment Agency re: Pacific Future Energy Refinery Project, Addendum to the Project Description - Activities that are Incidental to the Pacific
  • Attachment Included
  •       www.ecojustice.ca info@ecojustice.ca 1.800.926.7744 VANCOUVER CALGARY OTTAWA TORONTO   December 15, 2016 Sent via email Brett Maracle, Panel Manager Canadian Environmental Assessment Agency 410 – 701 West Georgia Street Vancouver, British Columbia V7Y 1C6 Barry Robinson Suite 800, 744 – 4th Ave SW Calgary, Alberta T2P 3T4 Tel: Fax: File No. 729 Email: PacificRefinery@ceaa.gc.ca Dear Sir: Re: Pacific Future Energy Refinery Project, Ref. No. 80127 Addendum to the Project Description – Activities that are Incidental to the Pacific Future Energy Refinery Project I write to you on behalf of our client, Douglas Channel Watch, in relation to the above referenced environmental assessment being undertaken by the Canadian Environmental Assessment Agency (the “Agency”). As you know, on October 7, 2016, the Agency posted its Draft Environmental Impact Statement Guidelines (“Draft EIS Guidelines”) for the Pacific Future ...

Attachment From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Comments on the Draft Environmental Impact Statement Guidelines (NOTE: Updated November 22, 2016)

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 71
  • Submitted: 2016-11-09
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Comments on the Draft Environmental Impact Statement Guidelines (NOTE: Updated November 22, 2016)
  • Attachment Included
  • 1+1 Environment and Climate Change Canada Environmental Protection Operations Environmental Stewardship Branch Pacific and Yukon 201 - 401 Burrard Street Vancouver, BC V6C 3S5 November 9, 2016 Brent Maracle Panel Manager Environnement et Changement climatique Canada Canadian Environmental Assessment Agency 160 Elgin St. 22nd Floor Ottawa, ON K1A OH3 Dear Mr. Maracle: ECPT: 16-0601 Re: Environmental Assessment of the Proposed Pacific Future Energy Refinery Project - Environment and Climate Change Canada Comments on the Draft Environmental Impact Statement Guidelines (draft EIS Guidelines) Environment and Climate Change Canada (ECCC) has completed a review of the following document provided by the Canadian Environmental Assessment Agency (Agency) on October 11, 2016: • Draft Guidelines for the Preparation of an Environmental Impact" Statement pursuant to ~he Canadian Environmental Assessment Act, 2012. Pacific Future Energy Refinery Project Proposed by ...

Attachment From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 51
  • Submitted: 2016-07-22
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Environment and Climate Change Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project
  • Attachment Included
  • Federal Authority Advice Record Response due by: July 21, 2016 Pacific Future Energy Refinery Project- Pacific Future Energy Corporation Agency File No.: 005565 DepartmenUAgency: I Environment and Climate Change Canada EA Contact Marc LaPointe Telephone: Name: Address: 91782 Alaska Highway, Whitehorse YT, Y1A OX5 Fax: Email: marc.lapointe3@canada.ca (867)667 -3403 1. (a) Indicate whether the description of potential environmental effects presented in the Project Description is · sufficient in characterizing project effects to the components of the environment, as defined under section 5 of CEAA 2012, that relate to your mandate, including whether these effects may be adverse. The Pacific Future Energy Refinery Project Description, dated June 2016, does not sufficiently characterize potential effects from the proposed project to components of the environment, as defined under section 5 of CEAA 2012. For example: • Migratory Birds and non-aquatic Species at ...

Attachment From Natural Resources Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 48
  • Submitted: 2016-07-21
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Natural Resources Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project
  • Attachment Included
  • ••• Natural Resources Ressot.RCeS natureltes Canocla Canoda July 21, 2016 Rob Hajdu Project Manager Canadian Environmental Assessment Agency Re: Determination of Environmental Assessment Requirements for the Pacific Future Energy Refinery Project, B.C. Please find attached Natural Resources Canada's (NRCan) response to the Canadian Environmental Assessment Agency's (CEA Agency) request for information for the Federal Authority Advice Record (FAAR) regarding the Pacific Future Energy Refinery Project, B.C. NRCan is submitting this response pursuant to section 11 of CEAA 2012. The response includes two attachments: (1) a completed "Federal Authority Advice Record" and (2) Supplemental Information in response to questions 2(a) and 4 of the "Federal Authority Advice Record". If you have any questions or require clarification on our comments please feel free to contact me at (343) 292-6360. Sincerely, A/Environmental Assessment Officer Office of the Chief ...

Attachment From Transport Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 50
  • Submitted: 2016-07-21
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Transport Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project
  • Attachment Included
  • From: L"Heureux, Suzanne To: Hajdu,Rob [CEAA] Cc: Doucette, Paula: TC; Chatwell, Ian: TC; Hall, Ronald: TC; Hubbard, Cindy; Parkinson, Colin R: TC; Beavis, Katherine: TC Subject: RE: TC Federal Authority Advice Record - Pacific Future Energy Refinery Project - Transport Canada"s response Date: July 21, 2016 12:08:19 PM Attachments: Minor Works Order as published in the Canada Gazette April 19 2014 (2).pdf Hi Rob, As requested, please find Transport Canada’s responses to the FAAR questions below. 1. Indicate whether the description of potential environmental effects presented in the Project Description is sufficient in characterizing project effects to the components of the environment, as defined under section 5 of CEAA 2012, that relate to your mandate, including whether these effects may be adverse. · TC Response: Generally yes, although TC has one comment. The following 3 paragraphs were extracted from the proponent’s Project Description: “… our Project ...

Attachment From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project

  • Pacific Future Energy Refinery Project
  • Author: Administration
  • Reference Number: 47
  • Submitted: 2016-07-20
  • Project Phase: N/A
  • Participation Notice: N/A
  • From Fisheries and Oceans Canada to the Canadian Environmental Assessment Agency re: Response to the Federal Authority Advice Record for the Proposed Pacific Future Energy Refinery Project
  • Attachment Included
  • Federal Authority Advice Record Response due by: July 21, 2016 Pacific Future Energy Refinery Project- Pacific Future Energy Corporation Agency File No.: 005565 Depa~menUAgency : I Fisheries and Oceans Canada EA Contact Michael Engelsjord Telephone: Name: Address: 401 Burrard Street, Vancouver, B.C. Fax: Email: Michaei.Engelsjord@dfo-mpo.gc.ca 604-666-2365 1. (a) Indicate whether the description of potential environmental effects presented in the Project Description is sufficient in characterizing project effects to the components of the environment, as defined under section 5 of CEAA 2012, that relate to your mandate, including whether these effects may be adverse. The project description includes a general description of project components and activities. and a general description of the fish species that may use the freshwater environment in the vicin ity of the project. There is n0 description of aquatic resources in the vicinity of the project components ...