Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway
This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.
The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.
Document List
Report
Replacement Class Screening Report
Statement of Project (July 1 to September 30, 2007)
Ontario (42 projects)
Bastard
- 07-02-56713 Shoreline restoration
- 07-02-56642 Repair existing dock
Chaffeys Locks
- 07-02-51862 Wall repairs
Drummond/North Elmsley
- 07-02-56643 Installation of aluminium dock
- 07-02-56641 Installation of new fendock with 8 ft ramp, 24 ft dock and weed harvesting
Jones Falls
- 07-02-51869 Temporary docks for tribute to labour
Kingston
- 07-02-56700 Installation of a 6x45 pile dock and rip-rap
- 07-02-56696 Shoreline stabilization and installation of floating dock with ramp
- 07-02-56674 Installation of shore pier with a 6" ramp, a 4x8 intermediate dock and a 6x16 t shaped
Kingston Mills
- 07-02-51871 Coping and Quoin Repairs of lock 46, Kingston Mills
- 07-02-51866 Concrete deck repair- Fortis dam- Kingston mills
Little Cranberry Lake
- 07-02-51873 Dam stabilization
Lovesick Lake
- 07-02-34024 Dock, Installation, Repair and Removal
Montague
- 07-02-56717 Redevelopement of existing boat slip
Otonabee River
- 07-02-33971 Bridge Maintenance and Repair
Ottawa
- 07-02-56732 Reinstatement of existing gabion retaining wall
- 07-02-56706 Water Intake Installation
- 07-02-56697 Installation of 30x10 post dock and replacement of old dock
- 07-02-56675 Rock removal from river
- 07-02-56668 Installation of rip-rap and storm sewer
- 07-02-55332 Aquatic Vegetation Removal
Rideau Lakes
- 07-02-56705 Manually remove 2-3 ft of rubble riverbed
- 07-02-56698 Replacing existing top 2 timbers on exisitng dock
- 07-02-56684 Removal of old floating dock.Installation of 8x16 dock with a 4x12 ramp
- 07-02-56683 Replacement of existing deck
- 07-02-56680 Shoreline stabilization
- 07-02-56679 Installation of rip-rap to protect from shoreline erosion
- 07-02-56676 Installation of a floating dock
- 07-02-56666 Installation of floating dock, with a 5x22 ramp and a 8x17 one
- 07-02-56663 Attach a new 6x20 floating dock onto end of existing crib dock
- 07-02-56662 Installation of 48x5 dock and a 10x10 boat lift
- 07-02-56661 Repair existing timber wall
- 07-02-56433 Cutting and Removal of Weeds
Smiths Falls
- 07-02-56693 Installation of foot bridge over creek
South Frontenac
- 07-02-56710 Construction of 2x40 walking bridge
- 07-02-56667 Removal of existing dock and replace with 8x20 floating dock with 5" ramp
Tay Valley
- 07-02-56682 Shoreline stabilizaton using rip rap
- 07-02-56677 Installation of 8x16 floating dock with 5x10 ramp
Trent River
- 07-02-34026 Dewatering and Minor Lock/Dam Maintenance
- 07-02-33972 Bridge Maintenance and Repair
Wolford
- 07-02-56664 Installation of a 4x16 aluminium dock with a 8" ramp
- 07-02-56640 Installation of new 4x16 dock with 8" ramp
- Date modified: