Fixed Aids to Navigation - Maritimes Region

This report was declared by the Agency as a class screening report on August 2, 2008, following a public comment period held between May 28, 2008 and June 27, 2008.

The Agency acknowledged the commitment of Fisheries and Oceans Canada and Transport Canada to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until August 2, 2018.

Note: This class screening is no longer required because the Canadian Environmental Assessment Act was repealed.

Document List

Report

Replacement Class Screening Report (Final)


Statement of Project   (all projects)

New Brunswick  (36 projects)

Bas-Cap-Pelé

  • 11-02-62058 Bas Cap Pele Wharf - install tower on concrete block

Bernache, Pointe à

  • 12-02-68313 Pointe à Bernache Range Front and Rear Tower Replacement and Shoreline Protection

Black Point

  • 12-02-68349 Black Point replace millard tower with steel tower

Black Rock

Blacks Harbour

  • 12-02-68343 Blacks Harbour Wharf tower replacement
  • 11-02-62061 Blacks Harbour Inner - new swing pole installation

Campobello Island

Cap-Pele

  • 12-02-68301 Install new foundation and underground service at Cap Pele Approach

Cape Tormentine

  • 10-02-54401 Breakwater (LL# 1091.5) Installation of new engineered tower on existing foundation

Dipper Harbour Back Cove

  • 12-02-68342 Dipper Harbour Breakwater tower replacement

Edward, Mount

  • 11-02-63196 St Edward De Kent LL# 1126 Skelleton tower installation

Escuminac

Escuminac, Point

  • 08-02-43143 Point Escumanac Tower Replacement, New Brunswick

Fairhaven

  • 09-02-46739 Fairhaven (LL # 48) - Mallard wharf replacement with a swingpole

Five Fathom Hole

  • 09-02-46740 Five Fathom Hole (LL # 97.5) mallard wharf replacement with a swingpole

Great Duck Island

  • 12-02-68345 Great Duck Island tower replacement and solarization

Head Harbour

  • 10-02-54398 Head Harbour Inner (LL #44.5) Installation of new 10' swing pole on existing wharf

Ingalls Head

  • 09-02-46698 Ingalls Head Millard Wharf Tower Replacement

Lamèque

  • 12-02-68314 Pointe de Petite-Lameque Front and Rear Tower Replacement

Little Letete Passage

  • 12-02-68317 Little Letete Passage Replace Tower and Include Fall Restraint

Lords Cove

  • 10-02-54397 Lords Cove (LL #53.5) Installation of new 10' swing pole on new foundation

Marcelle, Pointe à

  • 12-02-68323 Pointe à Marcelle Range Rear Tower Replacement
  • 12-02-65806 Relocate tower and install underground service at Point A Marcelle Range Front

Saint Martins

  • 10-02-54407 St. Martins (LL#152) Installation of new 20' engineered tower on existing foundation

Sams Islet

  • 10-02-54390 Sam's Islet Light (LL #22.5) tower replacement

Sandy Ledge

  • 10-02-54400 Sandy Ledge (LL#7043.2) Installation of new 24' spindle on new foundation

Shediac Harbour

  • 11-02-63193 Shediac Yacht Club Breakwater LL# 1111.5 Install swing pole

Splitting Knife Ledge

  • 10-02-54399 Rear Range ( LL #7074.5) Installation of new 20' spindle on new foundation

St. Andrews Point

  • 11-02-62383 Saint Andrew's (North Point) Install new 30' engineered tower and new foundation

Stonehaven

  • 12-02-68316 Stonehaven Tower Replacement
  • 11-02-62379 Stonehaven Breakwater Replace skeleton tower with aluminum swing pole

Stuart Town

  • 12-02-68302 Stuart Town Breakwater Replace Mallard Tower

Tinkers Upper Ledge

  • 10-02-54394 Radar Reflector LL #7044.6 Installation of new 20' spindle on new foundation

Two Hour Rock

  • 10-02-54395 (LL#57.2) Installation of new 20' engineered tower and new foundation

White Horse Islet

  • 09-02-52175 White Horse Islet placement of a new engineered steel tower on old foundation

Wilsons Beach

  • 10-02-54368 Wilsons Beach Wharf (LL#43)- Installation of New Swing Pole on Existing Wharf

Newfoundland and Labrador  (3 projects)

Cox's Point

  • 12-02-68350 Cox Point - mallard tower replacement with a swing poll

Ragged Beach

Tinker Island Shoal

  • 12-02-68311 Tinker Island north rear range tower replacement

Nova Scotia  (87 projects)

Arisaig

  • 11-02-62380 Arisaig front and rear tower installation

Balache Point

  • 09-02-51764 Balache Point Front Range Steel tower installation

Bar Island

  • 10-02-54386 Bar Island (LL# 294.8) Upgrade to self contained LED light

Battery Point

  • 12-02-68331 Battery Point Breakwater solarize the site

Bear Point

  • 09-02-46750 Bear Point (LL 316) - replace mallard wharf tower with swingpole

Bergmans Point

  • 10-02-54369 Bergeman Point Front (LL #939) and Rear (LL #940) tower replacements

Black Rock

  • 08-02-43254 Black Rock Point Sector Tower Replacement, Nova Scotia

Breton Cove

  • 09-02-46724 Breton Cove Front and Rear Range (LL#845.7 &845.8)

Broad Cove

Canso Harbour

  • 09-02-52188 Canso Harbour front and rear range steel tower installation on new foundation

Cape George

  • 09-02-46725 Cape George Light Station (LL # 892) Remediation

Caveau Point

  • 08-02-43281 Caveau Point Range Front Tower Replacement

Cherry Cove

  • 09-02-46699 Cherry Cove (LL 417.5) - tower solarization

Daniel Head

Digby Gut

Dingwall Harbour

  • 11-02-62060 Dingwall Harbour Inner and Outter Breakwater - bolting tower to breakwater rocks

Dover

  • 09-02-46713 Dover West (LL 487.5) - Replace mallard tower with swingpole

East Dover

  • 09-02-46715 East Dover Wharf (LL# 489) - Replace mallard tower with swingpole

East Point

East Sandy Cove

  • 09-02-46816 East Sandy (LL 230.2)- replace mallard tower with swingpole

Egg Island

Falls Point

  • 10-02-54393 The Falls (LL #315.2) Install new 20' spindle on new foundation
  • 09-02-46749 Falls Point Wharf (LL# 315) - Replace mallard wharf tower with swingpole

Feltzen South

  • 09-02-52181 Feltzen South solarization and new pipe pole installation on breakwater

Fishermans Harbour

  • 11-02-62382 Fishermans Harbour Install new 20' engineered tower and new foundation
  • 10-02-54403 Fishermans Harbour (LL#634) Installation of new 20' engineered tower and new foundation

Freeport

  • 09-02-46747 Freeport Wharf - replace mallard tower with swingpole

Gull Island

  • 10-02-54385 (LL# 295.9) Installation of new 20' engineered tower and new foundation

Halls Harbour

  • 09-02-46742 Halls Harbour (LL192) Mallard Wharf Tower Replacement with Swingpole

Harbourville

  • 11-02-62381 Harbourville Install new 20' engineered tower and new foundation.
  • 10-02-54406 Harbourville (LL#194) Installation of new 20' engineered tower and new foundation

Hart Island

  • 10-02-54402 Front (LL#679) and Rear (LL#679.1) Range - Installation of new towers and foundations

Herring Cove

  • 09-02-46721 Herring Cove (LL#522.1) - Replace mallard tower with swingpole

Hog Island

  • 10-02-54373 Hog Island (LL #654) Mallard tower replacement

Hubbards Cove

  • 09-02-52185 Hubbards Cove solarization and steel tower installation

Hunts Landing

Ingomar

  • 09-02-52178 Ingomar Wharf solarization and installation of a new pipe pole on existing breakwater

Inverness Harbour

  • 09-02-52174 Inverness harbour front and rear range installation of new steel towers

Little River

  • 11-02-62059 Little River Inner Breakwater - bolting tower to breakwater rocks
  • 09-02-46748 Little River (LL 230)- replace mallard tower with swingpole

Little River Harbour

  • 11-02-62378 Fixed Aids to Navigation - Maritimes Region

Lower Argyle

  • 10-02-54405 Lower Argyle Breakwater (LL# 295.5) Installationof new 20' swing pole on existing foundation

Lower Jordan Bay

Lower Prospect

  • 09-02-46719 Lower Prospect (LL#496.5) - Replace mallard wharf tower with swpingpole

Mackenzie Point

McIvers Head

  • 12-02-68324 McIvers Point front and rear range mallard tower

Meteghan River

  • 12-02-68333 Meteghan Breakwater new engineering metal tower and a fall restraint system

Moque Head

New Harbour

  • 09-02-52184 New Harbour pipe pole installation on existing breakwater

Newellton Reef

  • 12-02-68332 Newelton Breakwater new metal tower and a fall restraint system

Northern End Ledge

  • 10-02-54404 Northern End Ledge (LL#315.5) Installation of new 20' engineered tower and new foundation

Northwest Cove

  • 09-02-46700 Northwest Cove Wharf (LL 481) - Replace mallard tower with swingpole

Parrsboro

  • 09-02-46741 Parrsboro Wharf (LL 173) Mallard Wharf Tower Replacement with Swingpole

Peggys Cove

  • 09-02-46710 Peggy's Cove Wharf (LL# 486)- Replace mallard tower with swingpole

Petit-de-Grat Harbour

  • 12-02-68328 Petit-de-Grat Outer and Inner range front and Rear mallard tower replacement
  • 12-02-68327 Petit-De-Grat Breakwater mallard tower replacement

Pictou Island

  • 12-02-65804 Replace skeleton steel tower with aluminum swing pole at Pictou Island Breakwater

Pomquet Island

Port La Tour

  • 09-02-52177 Port la Tour solarisation and installation of a new pipe pole on an existing breakwater

Port Malcolm

  • 09-02-52189 Port Malcolm front and rear range main light change

Port Mouton

  • 09-02-52179 Port Mouton Inner Harbuor solarization and new swing pole installation

Port Wade

Prospect

  • 09-02-46717 Prospect Wharf (LL# 492) - Replace mallard tower with swingpole

Prospect Point

Rock Island Lake

Rouses Point

  • 12-02-68326 Rouse Point Replace Wooden Structure With Aluminum Container, Replace Fog Detector

Saulnierville Station

  • 12-02-68319 Saulnierville Breakwater new engineering metal tower and a fall restraint system

Seal Cove

  • 09-02-46737 Seal Cove Outer millard wharf tower replacement

Shag Harbour

  • 10-02-54384 Shag Harbour Ledges (LL #308.5) Upgrade to self contained LED light
  • 08-02-43252 Shag Harbour Wharf Tower Replacement, Nova Scotia

Sheet Harbour Passage

  • 10-02-54388 Front LL 598 and Rear Range LL #599 lighthouse refurbishments

Shingle Point

Ship Harbour

  • 09-02-46723 Ship Harbour (LL#585) - Replace mallard tower with swingpole

Snipe Reef

  • 10-02-54387 Snipe Reef (LL #293.2) Upgrade to self contained LED light

Spectacle Island

  • 12-02-68318 Spectacle Island West Replace Millard Tower with 10' steel pipe tower.

Stoney Island

  • 08-02-44426 Stoney Island Outer Breakwater Tower Replacement

Sydney Harbour

  • 09-02-46738 Light tower replacement - Sydney Rear Range Tower

Terence Bay

  • 09-02-46720 Terence Bay (LL# 499)- Replace mallard tower with swingpole

The Sluice

Three Top Island

  • 09-02-52187 Three top island - new engineered steel tower on new foundation

Thrumcap Island

  • 10-02-54391 (LL #612) Install new 20' engineered tower and new foundation

Tiverton

  • 09-02-46745 Tiverton (LL 217) Mallard Wharf Tower with a Swingpole

Upper Port La Tour

  • 09-02-52176 Upper Port La Tour installation and solarisation of a new swing ploe on existing wharf

Western Shore

  • 09-02-52183 Western Shore Inner solarization and pipe pole installation on existing breakwater
  • 09-02-52182 Western Shore Breakwater solarization and pipe pole installation

Whale Cove

  • 09-02-46744 Whale Cove Wharf (LL 215) Mallard Wharf Tower with a Swingpole

Prince Edward Island  (8 projects)

Bay Fortune

  • 10-02-58453 Electrical Services Upgrade at Fortune Bay North Sector (LL948.3)

Bear, Cape

Cape Egmont

  • 12-02-65805 Re-locate Canoe Gully front range and install underground service to front and rear ranges

Darnley Point

  • 11-02-63192 Darnley Bridge LL # 1071.2 light installation on bridge

Fortune, Bay

  • 11-02-62376 Fortune Bay North Sector Install underground service

Howards Cove

  • 11-02-62384 Howards Cove Breakwater - bolt tower to breakwater rocks

North Point

  • 11-02-63194 North Point East LL 1084.7 Swing pole installation