Fixed Aids to Navigation - Maritimes Region

This report was declared by the Agency as a class screening report on August 2, 2008, following a public comment period held between May 28, 2008 and June 27, 2008.

The Agency acknowledged the commitment of Fisheries and Oceans Canada and Transport Canada to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until August 2, 2018.

Note: This class screening is no longer required because the Canadian Environmental Assessment Act was repealed.

Document List

Report

Replacement Class Screening Report (Final)


Statement of Project   (April 1 to June 30, 2012)

New Brunswick  (13 projects)

Bernache, Pointe à

  • 12-02-68313 Pointe à Bernache Range Front and Rear Tower Replacement and Shoreline Protection

Black Point

  • 12-02-68349 Black Point replace millard tower with steel tower

Black Rock

Blacks Harbour

Campobello Island

Dipper Harbour Back Cove

  • 12-02-68342 Dipper Harbour Breakwater tower replacement

Escuminac

Great Duck Island

  • 12-02-68345 Great Duck Island tower replacement and solarization

Lamèque

  • 12-02-68314 Pointe de Petite-Lameque Front and Rear Tower Replacement

Little Letete Passage

  • 12-02-68317 Little Letete Passage Replace Tower and Include Fall Restraint

Marcelle, Pointe à

  • 12-02-68323 Pointe à Marcelle Range Rear Tower Replacement

Stonehaven

Stuart Town

  • 12-02-68302 Stuart Town Breakwater Replace Mallard Tower

Newfoundland and Labrador  (3 projects)

Cox's Point

  • 12-02-68350 Cox Point - mallard tower replacement with a swing poll

Ragged Beach

Tinker Island Shoal

  • 12-02-68311 Tinker Island north rear range tower replacement

Nova Scotia  (17 projects)

Battery Point

  • 12-02-68331 Battery Point Breakwater solarize the site

Broad Cove

Digby Gut

East Point

Lower Jordan Bay

Mackenzie Point

McIvers Head

  • 12-02-68324 McIvers Point front and rear range mallard tower

Meteghan River

  • 12-02-68333 Meteghan Breakwater new engineering metal tower and a fall restraint system

Moque Head

Newellton Reef

  • 12-02-68332 Newelton Breakwater new metal tower and a fall restraint system

Petit-de-Grat Harbour

  • 12-02-68328 Petit-de-Grat Outer and Inner range front and Rear mallard tower replacement
  • 12-02-68327 Petit-De-Grat Breakwater mallard tower replacement

Port Wade

Rock Island Lake

Rouses Point

  • 12-02-68326 Rouse Point Replace Wooden Structure With Aluminum Container, Replace Fog Detector

Saulnierville Station

  • 12-02-68319 Saulnierville Breakwater new engineering metal tower and a fall restraint system

Spectacle Island

  • 12-02-68318 Spectacle Island West Replace Millard Tower with 10' steel pipe tower.