Archived - Archived Replacement Class Screening Report
Archived Content
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Fixed Aids to Navigation - Maritimes Region
This report was declared by the Agency as a class screening report on August 2, 2008, following a public comment period held between May 28, 2008 and June 27, 2008.
The Agency acknowledged the commitment of Fisheries and Oceans Canada and Transport Canada to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until August 2, 2018.
Note: This class screening is no longer required because the Canadian Environmental Assessment Act was repealed.
Document List
Report
Replacement Class Screening Report (Final)
Statement of Project (April 1 to June 30, 2012)
New Brunswick (13 projects)
Bernache, Pointe à
- 12-02-68313 Pointe à Bernache Range Front and Rear Tower Replacement and Shoreline Protection
Black Point
- 12-02-68349 Black Point replace millard tower with steel tower
Black Rock
- 12-02-68312 Black Rock Tower Replacement
Blacks Harbour
- 12-02-68343 Blacks Harbour Wharf tower replacement
Campobello Island
- 12-02-68344 Southwest Wolf Island tower replacement
Dipper Harbour Back Cove
- 12-02-68342 Dipper Harbour Breakwater tower replacement
Escuminac
- 12-02-68315 Escuminac Breakwater Tower Replacement
Great Duck Island
- 12-02-68345 Great Duck Island tower replacement and solarization
Lamèque
- 12-02-68314 Pointe de Petite-Lameque Front and Rear Tower Replacement
Little Letete Passage
- 12-02-68317 Little Letete Passage Replace Tower and Include Fall Restraint
Marcelle, Pointe à
- 12-02-68323 Pointe à Marcelle Range Rear Tower Replacement
Stonehaven
- 12-02-68316 Stonehaven Tower Replacement
Stuart Town
- 12-02-68302 Stuart Town Breakwater Replace Mallard Tower
Newfoundland and Labrador (3 projects)
Cox's Point
- 12-02-68350 Cox Point - mallard tower replacement with a swing poll
Ragged Beach
- 12-02-68341 Remplacement d'un fuseau à Ragged Point
Tinker Island Shoal
- 12-02-68311 Tinker Island north rear range tower replacement
Nova Scotia (17 projects)
Battery Point
- 12-02-68331 Battery Point Breakwater solarize the site
Broad Cove
- 12-02-68346 Broad Cove Wharf tower replacement
Digby Gut
- 12-02-68348 Digby Gut tower replacement
East Point
- 12-02-68330 East Point Island Replace Mallard Tower
Lower Jordan Bay
- 12-02-68334 Lower Jordan Bay Wharf
Mackenzie Point
- 12-02-68325 MacKenzie Point replace mallard tower
McIvers Head
- 12-02-68324 McIvers Point front and rear range mallard tower
Meteghan River
- 12-02-68333 Meteghan Breakwater new engineering metal tower and a fall restraint system
Moque Head
- 12-02-68335 Moque Head replace mallard tower
Newellton Reef
- 12-02-68332 Newelton Breakwater new metal tower and a fall restraint system
Petit-de-Grat Harbour
- 12-02-68328 Petit-de-Grat Outer and Inner range front and Rear mallard tower replacement
- 12-02-68327 Petit-De-Grat Breakwater mallard tower replacement
Port Wade
- 12-02-68347 Port Wade tower replacement
Rock Island Lake
- 12-02-68329 Rock Island replace mallard tower
Rouses Point
- 12-02-68326 Rouse Point Replace Wooden Structure With Aluminum Container, Replace Fog Detector
Saulnierville Station
- 12-02-68319 Saulnierville Breakwater new engineering metal tower and a fall restraint system
Spectacle Island
- 12-02-68318 Spectacle Island West Replace Millard Tower with 10' steel pipe tower.
- Date modified: