Garden Hill First Nation Road Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Project is 304sqm and involves the design and construction of approximately 16.9 km of upgrades to existing gravel roads throughout Garden Hill First Nation (the Project area) including: -approximately 4.0 km of existing gravel road re-surfacing and 800 m of ditch cleaning along the main road north of the Causeway water crossing (North Area; Attachment 1) -approximately 7.8 km of existing gravel road re-surfacing, 600 m of gravel road re-construction, 1 km of soft spot repair, and 5.6 km of ditch cleaning along the main road and adjacent connecting roads from the Causeway water crossing through the main community townsite (Central Area; Attachment 1) -approximately 3.7 km of existing gravel road re-surfacing, 1.5 km of ditch cleaning, and 400 m of soft spot repair on the road located south of the Main Road (South Area) The road upgrades are anticipated to meet the following design criteria: -a two-lane gravel road with 3 m lane width, 3% rounding, and 1 m shoulder width, within an approximately 20 m cleared right of way (10 m on each side) -gravelled surface consisting of 200 mm thick A-base top course supported on a 450 mm thick C-base course overtop a woven geotextile with subbase compaction -corrugated steel pipe culverts (approximately 50) with varying diameters from 0.45 m to 1.2 m, discharging to ditches of approximately 1 m width with random stone riprap overtop of non-woven geotextile and compacted subgrade to support local drainage conditions -drainage ditches with 4:1 sideslope from the road, 1 m width, and 3:1 sideslope from the right of way
Project activities from January 2023 to July 2023 include: -repair a post and install hazard markers on the Causeway water crossing -clearing and grubbing of vegetation from right of way and ditches to improve drainage and sight lines (to occur in winter 2023) -excavation of the ditches to meet design criteria -placement, compaction, and grading of gravel materials to meet design criteria -culvert installations and replacements to improve drainage, designed to maintain fish passage where required -installation of road signage within the right of way to improve road safety.
Latest update
Participate
Contacts
Indigenous Services CanadaShelly Johnson, Senior Environmental Specialist
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0709
Email: shelly.johnson@sac-isc.gc.ca
-
Location
- Garden Hill (Manitoba)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2023-12-21 -
Proponent
Garden Hill First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87181
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
St Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
St Theresa Point Northern Store Contamination Remediation
St Theresa Point Former Bulk Fuel Plant -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Wasagamack - Fuel Tank Relocation - 2324
Wasagamack Fuel Tanks -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation -
God's Lake First Nation Lumber Compound Site Fencing
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
Aboveground Fuel Storage Replacement in God's Lake Narrows, Manitoba
God's Lake Narrows -
Red Sucker Lake First Nation New Aerated Lagoon
Red Sucker Lake First Nation -
Red Sucker Lake First Nation New Landfill
Red Sucker Lake -
Red Sucker Lake New School and Servicing
Red Sucker Lake First Nation New School and Services -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Manto Sipi Remediation of Former Band Tank Farm Site
Manto Sipi Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
East of Lake Winnipeg -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Bunibonibee Cree Nation - 48 Unit Subdivision
Bunibonibee Cree Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
Keewaywin First Nation New Landfill Access Road Construction
Kee-Way-Win First Nation -
Sachigo Lake First Nation - Lot Servicing for future houses
Sachigo Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kingfisher Lake PoP -
Sachigo Lake First Nation Wastewater Treatment Project
Sachigo Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
New Fibre Installation
North Spirit Lake -
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
Muskrat Dam - Reverend Tommy Beardy Memorial Family Treatment Centre Remediation
Muskrat Dam First Nation -
New Fibre Installation / Upgrade Multiple Towers
Cat Lake Wireless Tower -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River