Document Notice of Determination
- Project Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2024-01-25
- Document: 155216E.html
- Relevance: 382.24
- Notice of Determination January 25, 2024 The Department of National Defence has determined that the proposed ‘Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments ...
1 alternate format found
French HTML
- Relevance: 331.24
- Avis de détermination Le 25 janvier 2024 Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Conception et spécifications de performance pour le pont à guide d'ondes et les piliers de Groupe de soutien de la 3e Division du Canada (GS 3 Div C) Détachement de Edmonton' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples ...