Tk'emlúps te Secwepemc CLC Stormwater Detention Facility

The project involves the construction of a stormwater management pond with outfall to the Thompson River. The pond will include a perimeter trail, benches, and signage. Initially, a temporary outfall will be constructed, consisting of an open channel lined with erosion control matting. Later, a permanent piped system will replace the temporary outfall.


Latest update

October 20, 2023 – The public comment period on the project is closed. Infrastructure Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Notice of Intent to Make a Determination - Start of Public Comment Period - September 19, 2023

Contacts

Infrastructure Canada
Thomas Seeger, Environmental Officer
180 Kent Street
Suite 1100
Ottawa, Ontario K1P 0B6
Telephone: 343-550-1791
Email: thomas.seeger@infc.gc.ca


  • Location

    • Kamloops 1 (British Columbia)
  • Nature of Activity

    • Water Management
    • Maintenance activities (fences, walls)
  • Assessment Status

    In progress
  • Start Date

    2023-09-19
  • Proponent

    Tk'emlups te Secwepemc
  • Authorities

    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    85929