Red Mountain Underground Gold Project
Environmental Impact Statement
Volume 1
Front Matter
- Title Page (PDF – 602 KB)
- Document Map (PDF – 321 KB)
- Preface (PDF – 221 KB)
- Acknowledgements (PDF – 111 KB)
- Executive Summary (PDF – 1.15 MB)
- Table of Contents (PDF – 456 KB)
- List of Tables (PDF – 214 KB)
- List of Figures (PDF – 124 KB)
- Acronyms and Abbreviations (PDF – 254 KB)
- Glossary (PDF – 216 KB)
- Environmental Impact Statement Table of Concordance (PDF – 378 KB)
- Application Information Requirements Table of Concordance (PDF – 586 KB)
Volume 2
Part A: Introduction and Background
1. Project Overview (PDF – 10.6 MB)
2. Assessment Process (PDF – 534 KB)
3. Information Distribution and Consultation Overview (PDF – 586 KB)
4. Alternative Means of Undertaking the Project (PDF – 1.57 MB)
5. Closure and Reclamation (PDF – 4.6 MB)
Volume 3
Part B: Assessment of Environmental, Economic, Social, Heritage and Health Effects
6. Effects Assessment Methodology (PDF – 6.62 MB)
7. Air Quality Effects Assessment (PDF – 1.28 MB)
8. Noise Effects Assessment (PDF – 1.62 MB)
9. Landforms and Natural Landscapes Effects Assessment (PDF – 38.06 MB)
10. Hydrogeology Effects Assessment (PDF – 4.43 MB)
11. Groundwater Quality Effects Assessment (PDF – 6.34 MB)
12. Hydrology Effects Assessment (PDF – 4.58 MB)
13. Surface Water Quality Effects Assessment (PDF – 1.69 MB)
14. Sediment Quality Effects Assessment (PDF – 5.8 MB)
15. Vegetation and Ecosystems Effects Assessment (PDF – 24.1 MB)
16. Wildlife and Wildlife Habitat Effects Assessment (PDF – 11.78 MB)
17. Aquatic Resources Effects Assessment (PDF – 6.12 MB)
18. Fish and Fish Habitat Effects Assessment (PDF – 10.47 MB)
19. Economic Effects Assessment (PDF – 1.86 MB)
20. Social Effects Assessment (PDF – 2.83 MB)
21. Heritage Effects Assessment (PDF – 1.31 MB)
22. Health Effects Assessment (PDF – 2.51 MB)
23. Accidents and Malfunctions (PDF – 670 KB)
24. Effects of the Environment on the Project (PDF – 515 KB)
Volume 4
Part C: Aboriginal Consultation
25. Tsetsaut Skii km Lax Ha (PDF – 1.29 MB)
26. Métis Nation BC (PDF – 1.62 MB)
27. Nisga'a Nation (PDF – 590 KB)
Part D: Public Consultation
28. Public Consultation (PDF – 1.29 MB)
Volume 5
Part E: Management Plans and Monitoring
29. Management Plans (PDF – 13.96 MB) (NOTE: Updated December 1, 2017)
30. Monitoring and Follow-up Programs (PDF – 150 KB)
Volume 6
Part F: Conclusions
31. Conclusions (PDF – 747 KB)
Volume 7
Part A
- Appendix 1-A 2016 Geotechnical Site Investigation Report (PDF – 33.9 MB)
- Appendix 1-B Geochemical Characterization of Waste Rock, Ore, and Talus (PDF – 15.2 MB)
- Appendix 1-C Highway 37 and 37A Traffic Impact Study (PDF – 852 KB)
- Appendix 1-D Bromley Humps TMF Seepage and Stability Analysis (PDF – 3.19 MB)
- Appendix 1-E Underground Geotechnical Design (PDF – 3.58 MB)
- Appendix 1-F Underground Geological Cross Section (PDF – 390 KB)
- Appendix 1-G Mineral Tenures in the Regional Study Area (PDF – 323 KB)
- Appendix 1-H Tailings and Water Management Design Report (incl. Water Balance Report and Water Management Drawings) (PDF – 130 MB) (NOTE: Updated November 10, 2017)
- Appendix 1-I Feasibility Study Design Drawings (PDF – 113 MB) (NOTE: Updated November 10, 2017)
- Appendix 1-J Tailings Best Available Technology Assessment (incl. Alternative Assessment) (PDF – 19.7 MB)
- Appendix 1-K Geochemical Characterization of Metallurgical Tailings (PDF – 1.05 MB)
- Appendix 1-L Geochemical Characterization of Construction Materials (PDF – 11.4 MB)
Volume 8
Part B
- Appendix 7-A Air Quality Modelling Report (PDF – 7.69 MB)
- Appendix 8-A Noise Modelling Report (PDF – 1.14 MB)
- Appendix 9-A Ecosystems, Vegetation, Terrain, and Soils Baseline Report (PDF – 105 MB)
- Appendix 9-B Red Mountain Geophysical Baseline (PDF – 77.2 MB)
- Appendix 9-C Terrain Stability Assessment for the Project Footprint Study Area (PDF – 996 KB)
- Appendix 10-A Mine Area Hydrogeology Report (PDF – 41 MB)
- Appendix 10-B Bromley Humps Baseline Hydrogeology Report (PDF – 10.7 MB)
- Appendix 12-A Baseline Climate and Hydrology Report (PDF – 13.2 MB)
- Appendix 14-A Surface Water and Groundwater Quality Baseline Report (PDF – 42.8 MB)
- Appendix 14-B Water Quality Assessment of the Reasonable Upper Limit Case (PDF – 411 KB)
- Appendix 14-C Water and Load Balance Model Report (PDF – 78.3 MB)
- Appendix 16-A Baseline Wildlife Resources Reports (PDF – 62.2 MB)
- Appendix 18-A Baseline Fisheries and Aquatic Resources (PDF – 83.2 MB)
- Appendix 18-B Details of Baseline Fisheries Statistics (PDF – 419 KB)
- Appendix 19-A BC Input-Output Model Report: Red Mountain (PDF – 296 KB)
- Appendix 20-A Socio-Economic Baseline (PDF – 2.28 MB)
- Appendix 20-B Visual Quality Assessment (PDF – 707 KB)
- Appendix 21-A Archaeological Overview Assessment (PDF – 4.9 MB)
- Appendix 21-B Preliminary Field Reconnaissance (PDF – 24 MB)
- Appendix 22-A Human Health Risk Assessment Report (PDF – 9.79 MB) (NOTE: Updated November 28, 2017)
- Appendix 22-B Screening Level Ecological Assessment Report (PDF – 2.59 MB) (NOTE: Updated November 28, 2017)
- Appendix 23-A Tailings Dam Breach Analysis (PDF – 7.09 MB) (NOTE: Updated February 27, 2018)
Volume 9
Part C
- Appendix 27-A Aboriginal Consultation Report #2 (PDF – 702 KB)
Volume 10
Part D
- Appendix 28-A Public Consultation Report #2 (PDF – 1.39 MB)
Document reference number: 20