Project New Fibre Installation

  • Location (Project Site 1: Little Buffalo, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88524
  • Last Modified: 2024-05-25
  • Relevance: 799.75
  • The Lubicon Lake Band and Mighty Peace Wireless plan to install underground fiber optic cabling, for Internet purposes, to all residential homes in Little Buffalo, Alberta. The project involves the installation of approximately 36 km of underground fiber optic cable, of which about 10 km is on Federal Land, from the Bell/Axia POP site near the intersection of Calahesen Rd and Ominayak Rd, running through the community of Little Buffalo, and beyond, to the Lubicon Lake Band Cultural Center. ...

Project Coal water treatment plant upgrades - Neptune Terminal

  • Location (Coal water treatment plant upgrades - Neptune Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88523
  • Last Modified: 2024-05-25
  • Relevance: 799.75
  • The proposed project Neptune Bulk Terminals Ltd. (the Applicant) is proposing to upgrade the coal water treatment system located at their terminal. The system treats a mixture of stormwater runoff and any process water that contacts coal product from the coal handling parts only on the site. The new system will include coagulation, flocculation, clarification, and the use of a centrifuge for dewatering solids. The upgrades will meet existing quality and quantity objectives under the ...

Project Beaver dam and lodge removal

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88580
  • Last Modified: 2024-05-24
  • Relevance: 799.72
  • Two beaver dams and one beaver lodge will be removed from a small tributary of the Spruce River in Prince Albert National Park. The dams have potential to impact the structural integrity of the Anglin Lake Dam on the Spruce River. A dam safety review has identified the removal of the beaver dams as a very high priority. 

Project Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425

  • Location (Dauphin, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88578
  • Last Modified: 2024-05-24
  • Relevance: 799.71
  • The purpose of this project is to facilitate the construction of the Anishinaabe Aki Petro-Can Gas Bar in the community of Dauphin, MB on Pine Creek First Nation and Ebb and Flow First Nation Joint Reserve Land. 425m2 Physical works broken into two phases: Phase I - Petroleum equipment supply/install; Civil site works commencement and municipal connection with sewer, water, and storm drainage systems and Manitoba Transportation and Infrastructure. Phase II - Gas Station/Convenience ...

Project TC - Demo Project

  • Location (3730 Brock Rd, Pickering (PIN614205), Ontario) (3625 Brougham Rd (PIN614698-2), Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88577
  • Last Modified: 2024-05-24
  • Relevance: 799.71
  • Demolition of identified vacant structures located at Pickering Lands Site (Transport Canada). Work includes preparing Designated Substance Surveys and abatement along with detailed plans and specifications for demolition. Scope of work to specify abatement work, environmental mitigations, species at risk identification and mitigation, tree trimming/removal activities, utility disconnections, decommissioning of wells, cisterns, & septic systems, decommissioning of fuel oil storage tanks, ...

Project Addition of a Permanent Generator - Lester B. Pearson Building

  • Location (Lester B. Pearson Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88571
  • Last Modified: 2024-05-24
  • Relevance: 799.71
  • This project is intended to provide a permanent tenant generator that will provide the backup power for all tenant operations for the foreseeable future. With the implementation of the Lester B. Pearson Rehabilitation project underway, they are a number of newly renovated client spaces looking to add to the existing tenant generator distribution system. The proposed permanent generator would provide extra capacity as well as flexibility, when accommodating back up power connections for other ...

Project Maintenance dredging - Coastland Wood Industries

  • Location (Maintenance dredging - Coastland Wood Industries, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88576
  • Last Modified: 2024-05-24
  • Relevance: 799.7
  • Coastland Wood Industries are proposing to undertake maintenance dredging at their Annacis Marine Terminal located at 404 Salter Street New Westminster. The dredge area would be approximately 3,015 square metres and the targeted dredge grade would be approximately -3.6 metres chart datum, consistent with previous dredging works. The total dredge volume is anticipated to be no more than approximately 4,000 cubic metres per year. A clamshell dredge situated on a marine spud derrick would be used ...

Project Addition of a permanent base building/life safety generator - Lester B. Pearson Building

  • Location (Lester B. Pearson Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88572
  • Last Modified: 2024-05-24
  • Relevance: 799.7
  • This project is intended to provide a permanent base building/life safety generator that will provide the backup power for all base building/life safety operations for the foreseeable future. The proposed permanent generator would renew a significantly aging asset as the current base building generators are nearly 50 years old and well past their expected service life. Additionally, this project is looking to add its own fuel distribution system to supply only the base building/life safety ...

Project Culverts Replacement - Ottawa Laboratory (Fallowfield) - 3851 Fallowfield Rd, Ottawa, ON

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88505
  • Last Modified: 2024-05-24
  • Relevance: 799.64
  • The Canadian Food Inspection Agency (CFIA) wishes to replace two culverts located on the roads of its property at 3851 Fallowfield Rd, Ottawa (Ontario). The culverts have reached the end of their useful life, and must be replaced in order to maintain the access roads to the property's agricultural lots. The new culverts will have the same diameter as the old ones and are located on unnamed watercourses which are tributaries to Graham Creek.

Project Cap-Lumière DFO-SCH Containment Cell Construction

  • Location (The Cap-Lumière DFO-SCH is located on the Northumberland Strait in the parish of Richibucto, Kent County, New Brunswick., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88518
  • Last Modified: 2024-05-24
  • Relevance: 799.64
  • The proposed project at the Cap-Lumière SCH consists of the construction of a new containment cell for dredge material, located in the southwest corner of the SCH property, just outside the harbour basin and adjacent to the entrance channel. The project will have a total footprint of approximately 3480 m² including approximately 1840 m² of new rock berm.

Project Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth

  • Location (Kahkewistahaw First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88575
  • Last Modified: 2024-05-23
  • Relevance: 799.61
  • The Kahkewistahaw First Nation (KFN) is proposing to create an accessible walking trail that will link the Chief Joseph Crowe Governance Centre, the Elders' Centre, and the Chief Kahkewistahaw Community School. The project includes: Approximately 1.5km of walking trail A garden and outdoor teaching area for learning about culturally significant native plants and their interrelationship to the ecosystem Addition of native trees, shrubs and ground covers in the garden and along ...

Project Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation

  • Location (North Spirit Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88525
  • Last Modified: 2024-05-23
  • Relevance: 799.58
  • The Proposed Project North Spirit Lake First Nation is proposing the construction of three (3) new homes (121 square metres each) to address the community's housing needs. Project activities include: The demolition two (2) abandoned houses to clear the lots for two of the new homes. Note: Demolition is occurring within 30 metres of currently occupied residences; Preparation of the lots for construction (i.e. grading, levelling and filling); Construction of the new homes; And ...

Project Upgrade Cambridge Military Library at Royal Artillery Park - Canadian Forces Base Halifax

  • Location (Canadian Forces Base Halifax, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88574
  • Last Modified: 2024-05-23
  • Relevance: 799.58
  • The Department of National Defence (DND) is proposing to complete renovations, including hazardous material abatement, at building RA3 at Royal Artillery Park, Canadian Forces Base (CFB) Halifax. The scope of work includes: Performing comprehensive removal, cleaning, and decontamination of hazardous material. Removing and securing conditioned storage of existing furniture, equipment, artifacts, and collection. Selective demolishing of exterior and interior building components and ...

Project VIA Rail Slope Stabilization - Old Sly's Lockstation, 2024-25

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88514
  • Last Modified: 2024-05-23
  • Relevance: 799.53
  • VIA Rail is intending to retain the services of a Contractor to complete improvements to the masonry abutments and approach embankments of VIA Rail's bridge at Mile 1.20 of the Brockville Subdivision. The existing bridge at Mile 1.20 of the Brockville Subdivision carries a single track over the Rideau Canal National Historic Site and is located immediately downstream of the entrance to Parks Canada's Lock 27 (Old Sly's Lockstation) in the Town of Smiths Falls. The purpose of this ...

Project Southern Gulf Island Aids to Navigation Rebuild

  • Location (Mandarte Island, British Columbia) (Isabella Island, British Columbia) (Canoe Rock, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88515
  • Last Modified: 2024-05-23
  • Relevance: 799.53
  • A condition review of the navigational aids in the Southern Gulf Islands has found that many of the structures are in poor condition, non-compliant to Canadian Coast Guard directives for service, and/or non-compliant to current Canadian standards for safety to the workers who maintain them. The sites are all accessible by small vessel. The Canadian Coast Guard proposes to refurbish twenty one navigational aids in the Southern Gulf Islands. Of these twenty one aids 3 are located in the Gulf ...

Project Vancouver International Airport (YVR) Lot S30 Remediation Project

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88559
  • Last Modified: 2024-05-22
  • Relevance: 799.5
  • Transport Canada is proposing to conduct soil remediation on Lot S30 at the Vancouver International Airport in Richmond, BC. The Vancouver Airport Authority may need to issue a permit to enable the remedial works on the land under their administration. The Lot S30 site is a 3.8 ha area that is currently used for truck parking and as an aircraft apron near the South Terminal of Vancouver International Airport, north of Inglis Drive and west of Cowley Crescent. Inglis Drive is adjacent to the ...

Project Construct Hazardous Waste Storage Facility - Garrison Wainwright

  • Location (Garrison Wainwright, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88570
  • Last Modified: 2024-05-22
  • Relevance: 799.49
  • The Department of National Defence (DND) has proposed construction of a new facility for storage and transfer of hazardous waste materials at Garrison Wainwright. The facility will include both indoor and outdoor storage areas and access to waste fuel/oil/glycol tanks. The project also includes renovations to the interior of an existing building (B465) which provides office space and storage of petroleum products.

Project Highway 93 South km 52.3 Bank Stabilization

  • Location (Kootenay/Yoho/Banff National Parks of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88569
  • Last Modified: 2024-05-22
  • Relevance: 799.47
  • On going erosion monitoring on the Hwy 93S corridor has identified an active and high-risk erosion area at km 52.3. Slumping trees and erosion observed at the toe of the highway embankment are signs of active erosion, and the highway embankment can be compromised during high water events. The objective of this project is to protect the highway embankment with riprap armouring to arrest active and on-going bank erosion, and to reduce the risk of erosion and loss of the highway embankment to ...

Project Vegetation Management in the Static Range Impact Area - 5th Canadian Division Support Base, Gagetown

  • Location (5th Canadian Division Support Base, Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88568
  • Last Modified: 2024-05-22
  • Relevance: 799.47
  • The Department of National Defence (DND) has proposed a project. Vegetation management is necessary to reduce the fire risk around ranges and fuel breaks, allow for clear lines of site into the impact areas, clear out vegetation from ranges and reduce vegetation to allow unexploded explosive ordnance (UXO) activities to take place. Means of vegetation management will be site specific and/or could include mulching, burning, mature tree removal and/or use of herbicide.

Project Okeover Inlet Wharf Reconstruction

  • Location (Okeover Inlet, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88510
  • Last Modified: 2024-05-22
  • Relevance: 799.42
  • Small Craft Harbours (SCH) is undertaking a project to reconstruct the timber wharf at Okeover Inlet Harbour.  The wharf allows user access to floats for vessel moorage and provides vehicle access for loading and offloading of aquaculture and fishing vessels.  The project also includes reconstruction of the floating plastic pipe breakwater that provides important shelter from northwest waves. The wharf has suffered degradation with age and is past its useful life.  The ...

Project Rosewall Creek Research Hatchery - Hatchery Retrofit - Circular Fiberglass Tub Farm Installation

  • Location (Rosewall Creek Hatchery, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88511
  • Last Modified: 2024-05-22
  • Relevance: 799.42
  • As part of the PSSI and associated Salmonid Enhancement Program (SEP) initiatives, the Rosewall Creek Research Hatchery (Rosewall Hatchery) was selected to receive funding to expand the aquaculture capacity on-site to meet specific conservation enhancement targets for salmonid populations. To facilitate the required program expansion, the overall rearing capacity of the hatchery must be expanded. This project will take part in two phases and is occurring within a previously developed area. ...

Project Private Residence - Trent-Severn Waterway - 96 Hewall Trail, Katchewanooka Lake - Dredge and Launch Ramp

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88566
  • Last Modified: 2024-05-21
  • Relevance: 799.38
  • The overall intent of this project is to dredge an area of 28.1 m2 and install a launch ramp with an area of 39.1 m2 to accommodate the launching of a boat. The project components include: - Dredge an area of 3.7 m x 7.6 m = 28.1 m2. The existing water depth in the proposed dredge area is 0.15 – 0.2 m which will be dredged and filled with aggregate to a depth of 0.76 m. - Dredging will be completed from land using a long reach excavator fitted with a 1-yard bucket. - If ...

Project Duncan's First Nation New Subdivision - 22 units

  • Location (Duncan First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88567
  • Last Modified: 2024-05-21
  • Relevance: 799.37
  • Duncan First Nation plans to build a new subdivision for 22 residential housing units. The project will occur within ATS section 16-82-25-W5M. The proposed work will include vegetation clearing and construction of a road surface and 22 bordering subdivision lots. The road surface will be 8 m wide with a 1 m wide ditch, with a total right of way width of 30m. The road will tie-in to Range Road 254 and Township Road 822. PVC sanitary pipe and water main pipe will also be installed. The total ...

Project Loon River First Nation Wastewater Treatment Facility Upgrade and Expansion

  • Location (Loon River First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88565
  • Last Modified: 2024-05-21
  • Relevance: 799.37
  • Loon River First Nation is proposing an upgrade and expansion of their current wastewater system. The project is located within NE-09-87-9-W5M and SE-09-87-9-W5M. The existing lagoon is undersized and unable to accommodate the additional volume from the construction of a new water treatment plant. The lagoon expansion will require tree clearing, and soil stripping and excavation (~7,500 square meters of clearing). Maintenance vegetation removal and additional modifications to the existing ...

Project Warehouse upgrades - Annacis Auto Terminal

  • Location (Warehouse upgrades - Annacis Auto Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88512
  • Last Modified: 2024-05-21
  • Relevance: 799.31
  • The proposed project   WWL Vehicle Services Canada Ltd. is proposing to replace the current asphalt floor in their warehouse located at the Annacis Auto Terminal. In addition, to bring the warehouse up to the current 2020 Building Code a new warehouse pallet racking system will be installed, and a new fire suppression system will be installed complete with a fire pump and backup generator. New lighting and electrical room upgrades will occur as well.   The project ...

Project Diversifying service offerings and increasing the capacity of the DG Canest Transit inc. terminal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88504
  • Last Modified: 2024-05-20
  • Relevance: 799.2
  • The proposed project is part of the National Trade Corridors Fund (NTCF) financing agreement reached between Montreal Port Authority and Transport Canada. The objectives of the project are to diversify the service offerings and increase the capacity of the DG Canest Transit inc. terminal. The project will take place at the sections 43 and 44 of the Port of Montreal (3700 Notre-Dame Est Street) and will include the following works Adjusting and adding equipments inside the existing ...

Project St. Laurent Boulevard Pipeline Replacement Project

  • Location (Nicholson Building RCMP HQ, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88502
  • Last Modified: 2024-05-19
  • Relevance: 799.1
  • Enbridge Gas Inc. (Enbridge Gas) is proposing to replace its St. Laurent Pipeline System that is currently located along St. Laurent Boulevard in Ottawa, Ontario (the Project). The Project is located east of the Rideau River and south of the Ottawa River, generally in the neighbourhoods of Rockcliffe and Manor parks, Vanier, Overbrook, Forbes, Cummings, Cyrville, and Ottawa South. The Project will involve the installation of approximately 13 km of new 6-inch, 12-inch, and 16-inch diameter ...

Project Installation of New Generator - 101 Colonel By Drive

  • Location (101 Colonel By Drive, Ottawa, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88493
  • Last Modified: 2024-05-18
  • Relevance: 798.99
  • The objective of this project is to demolish the old generators in room BS-076 and remove the current temporary generator and install a new permanent 1000Kw, 1,250 kVA, 347/600V standby generator in its place. The Generator will be one self-contained unit that includes a 2,500 L sub base fuel storage tank and a skin tight sound attenuated enclosure. The location of the new generator will be the same as the current temporary generator, outside of the building on the west side of the ...

Project Beardy's & Okemasis Cree Nation Stage 4 Subdivision

  • Location (Beardy's & Okemasis Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88564
  • Last Modified: 2024-05-17
  • Relevance: 798.96
  • The Beardy's & Okemasis Cree Nation Stage 4 Subdivision is proposing to construct 132 new residential lots to support future growth and housing on-reserve for the next 10 years. The Stage 4 Subdivision location was selected north and east of the Stage 3 Subdivision and will occupy approximately 82 hectares of land currently used for recreational and agricultural purposes. The project will include earthworks for lot grading and drainage and infrastructure for water, wastewater, roadway, ...

Project East promenade renewal - Canada Place

  • Location (East promenade renewal - Canada Place, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88562
  • Last Modified: 2024-05-17
  • Relevance: 798.96
  • Vancouver Fraser Port Authority (VFPA, the Applicant) is responsible for the rehabilitation and upgrading of the Canada Place east promenade located at 999 Canada Place (the Project) in Vancouver. The work generally includes rehabilitation and upgrade of the east promenade deck topping and waterproofing membrane. The promenade serves as the roof of interior space below. The following items have been identified as requiring rehabilitation / upgrade: Remove and replace the promenade ...

Project Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton

  • Location (3rd Canadian Division Support Group, Edmonton, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88563
  • Last Modified: 2024-05-17
  • Relevance: 798.94
  • The Department of National Defence (DND) is proposing the Defence Capability Infrastructure (DCI) project that will provide the infrastructure required to support the accommodation, operation and maintenance support for the 360 new Armoured Combat Support Vehicles (ACSV) at 3rd Canadian Division Support Group (3 CDSG) Edmonton, Alberta. To facilitate the new ACSV, infrastructure to accommodate approximately 9 bays with an estimated total gross floor area of 4,400 m² is required. The ...

Project NAV CANADA - Radiocommunications Tower (PRJ02758-Outside Plant FY24) - Ascot Corner (QC)

  • Location (PRJ02758-Outside Plant FY24 - Ascot Corner, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88561
  • Last Modified: 2024-05-17
  • Relevance: 798.94
  • NAV CANADA – Radiocommunications Tower (PRJ02758-Outside Plant FY24) – Ascot Corner (QC) NAV CANADA is proposing to erect a new 21.1 metre self-support tower located on chemin Deblois in Ascot Corner, to the northeast of Sherbrooke in Quebec. The purpose of this tower is to replace a 16.9 metre self-support tower that has reached end of life. This project will install a new 11 x 20 feet equipment shelter, erect a new antenna support tower, install equipment and RF cables. The ...

Project James Smith Cree Nation Peonan Creek Crossing

  • Location (James Smith Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88501
  • Last Modified: 2024-05-17
  • Relevance: 798.92
  • James Smith Cree Nation is proposing to install a new single span bridge over Peonan Creek northwest of the community core to connect housing and services on the west side of the creek to the community and to provide access to the new Wellness Centre and existing Sakwatamo Lodge. The bridge will be constructed at the former location of a large-diameter culvert crossing which washed out in 2007. Construction activities include site preparation by topsoil stripping and stockpiling, grading to ...

Project Trans Mountain Pipeline Site KP387 Bioremediation

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88500
  • Last Modified: 2024-05-17
  • Relevance: 798.88
  • During a reactivation dig in 2021, historical petroleum hydrocarbon contamination was discovered at a site on the Trans Mountain pipeline right of way (RoW) located 8 km west of Jasper and next to the Miette River. Further assessment delineated contamination along the right of way and adjacent wetland, fen and marsh. The Remedial Action Plan recommends in-situ bioremediation as the best option to reduce contaminants to acceptable levels in both soil and groundwater, while minimizing further ...

Project Rehabilitation of the Ottawa River Pathway East

  • Location (Rehabilitation of the Ottawa River Pathway East, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88499
  • Last Modified: 2024-05-17
  • Relevance: 798.88
  • The Capital Pathway is a key asset of the National Capital Commission (NCC) and connects more than 200 km of multi-use pathways. It extends from Gatineau Park, through Ottawa and into the Greenbelt. The pathway network connects the capital's parks, gardens, museums, and main attractions along the way for walking, running, cycling, in-line skating including several winter activities. The NCC has completed condition assessments along the Capital Pathway to identify areas requiring ...

Project Northlands Enabling Works

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88486
  • Last Modified: 2024-05-16
  • Relevance: 798.84
  • The Vancouver Airport Authority is preparing for future development of the Northlands properties located at the Vancouver International Airport in Richmond, B.C. The project will involve relocating approximately 2.5km of the primary security fence on the north side of the airfield.  In addition to relocating security fence the project will include construction of a new 2.5 km gravel access road within the airfield parallel to the new fence alignment, excavation of a new drainage ditch and ...

Project YMX International Aerocity of Mirabel - Soil rehabilitation on the site occupied by Mechachrome Canada Inc.

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88560
  • Last Modified: 2024-05-16
  • Relevance: 798.83
  • The project consists of rehabilitating the soil of a portion of a retention basin located at 11,100 Julien-Audette Street at YMX International Aerocity of Mirabel on lots 5,257,239 and 5,257,236 of the Cadastre du Québec. The site is occupied by Mechachrome Canada Inc. The soils to be rehabilitated correspond to criteria "C" and above of the MELCCFP's Intervention Guide – Soil Protection and Rehabilitation of Contaminated Land and/or the CCME's industrial ...

Project Dry fire Hydrant in range and training areas - Valcartier Military Base Range and Training Area

  • Location (Valcartier Military Base Range and Training Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88558
  • Last Modified: 2024-05-16
  • Relevance: 798.83
  • The Department of National Defence (DND) has proposed a project. The goal of the project is to install a dry fire hydrant on the bridge crossing the Petite Rivière aux Pins. The dry fire hydrant will allow firetrucks to fill their tanks during emergencies.

Project ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425

  • Location (Kinonjeoshtegon First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88557
  • Last Modified: 2024-05-16
  • Relevance: 798.83
  • 1639m2 single storey, steel stud, metal-clad building with new gravel access and ten gravel parking stalls with electrical outlets. Two drainage swales on the south and north sides of the site, connecting to the exisiting drainage sitch east of the site. Approximately 30m to 50mm diameter potable water main, connecting to the existing municipal water infrastructure west of the site. Approximately 50m to 200mm diameter wastewater sewer, connecting to the existing municipal wastewater ...

Project Whitby Harbour Sediment Remediation, Whitby, Ontario

  • Location (Whitby Harbour, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87408
  • Last Modified: 2024-05-16
  • Relevance: 798.77
  • Fisheries and Oceans Canada (DFO)  proposes to undertake a sediment remediation project to address historic dioxin and furan contamination in Whitby Harbour, which is located on the northern shore of Lake Ontario, in the Town of Whitby, Ontario. The Whitby Harbour Sediment remediation Project includes the following activities: Establish a temporary storage area (TSA) equipped with a drainage culvert for dredge material. Construction of a transfer dock to facilitate the movement ...

Project Kinonjeoshtegon - CHRT 41 - CFS CENTER AND ASSOCIATED BUIDLINGS - P048401 - 2425

  • Location (Kitechuhmaykoosib Inninuwug First Nation, Ontario) (Kitechuhmaykoosib Inninuwug First Nation - Main site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88491
  • Last Modified: 2024-05-16
  • Relevance: 798.77
  • The proposed project is located in Kitechuhmaykoosib Inninuwug First Nation (KIFN), Ontario approximately 580 km north of Thunder Bay, Ontario. The Project includes two sites (Attachment 1: Figure 1) •Site #1 (the main site) is located at approximate UTM coordinates 16 U 307408 m E 5969562 m N within the main community on land parcel Part 1 Location CL 1715 of Kitchenuhmaykoosib Aaki No. 84 on Canada Land Survey Record 59544 and will be accessible by road year-round •Site #2 (the ...

Project ToB 24DP05 Banff Centre Renovations

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88492
  • Last Modified: 2024-05-16
  • Relevance: 798.77
  • The proponent is proposing interior and exterior renovations to two buildings at the Banff Centre for Arts and Creativity. The two buildings, Vinci and Farrally Hall, are at 100 and 104 St Julien Road. Both buildings will undergo various upgrades, such as new windows and doors, mechanical equipment, and walkways. The upgrades aim to improve the buildings' mechanical and electrical systems, life safety, accessibility, and interior finishes.

Project ToB 23DP65 7 Fairholme Place Deck Repair

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88494
  • Last Modified: 2024-05-16
  • Relevance: 798.77
  • The proponent is proposing to repair the existing deck at 7 Fairholme Place. Work will involve partially demolishing the existing deck and piles and installing the new deck and piles. The new deck will require four new piles and be approximately 9m2 larger than the existing one. No changes to utilities are anticipated. The project will take approximately four weeks to complete.

Project Sweetgrass First Nation Wastewater System Upgrades

  • Location (Sweetgrass First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88556
  • Last Modified: 2024-05-15
  • Relevance: 798.74
  • Sweetgrass First Nation is proposing a wastewater system upgrade project that entails capacity upgrades to the existing lagoon, construction of a new sewage pumping station, and installation of connecting underground sewage force main and sanitary mains. Upgrades completed through this project will provide the community with adequate wastewater infrastructure capacity to support the community's current and future needs. The lagoon expansion site is located immediately east of the ...

Project FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm

  • Location (FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87251
  • Last Modified: 2024-05-15
  • Relevance: 798.73
  • FortisBC Energy Inc. proposes to carry out improvements to an existing barge landing site at the head of Indian Arm of Burrard Inlet. The improvements are required so the site can be used to support project activities related to the proposed Eagle Mountain Woodfibre Gas Pipeline Project. The barge landing would be used for the delivery of materials, equipment, and personnel to the eastern portion of the pipeline route. The improvements would include expansion of a truck turn around area and ...

Project Removal of the Ville de Vanier wreckage from the Lac Leamy outlet in Gatineau, Quebec

  • Location (Lac Leamy landfill, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88552
  • Last Modified: 2024-05-15
  • Relevance: 798.72
  • The Canadian Coast Guard (CCG) wishes to remove the wreck of the schooner Ville de Vanier which is in the waters of the outlet arm of Lac Leamy, in Gatineau. This wreck was considered a vessel of potential concern in 2019, and was the subject of a technical assessment in 2020 which led to the decision to proceed with its removal from the waters. Indeed, it presents dangers for the safety, health, well-being of the public and the environment, and an advanced state of ...

Project Lower Similkameen Indian Band - Deflection Berms Project

  • Location (Lower Similkameen Indian Band - Deflection Berms Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88553
  • Last Modified: 2024-05-14
  • Relevance: 798.63
  • The Lower Similkameen Indian Band Band is proposing to build two deflection berms on the Similkameen Indian Reserve No. 2.   The project scope is to build two earthen berms (630m and 260m long) upslope of existing and planned development to deflect flood waters away from structures downslope. The proponent has applied for funding from Indigenous Services Canada's Community Infrastructure Program the construction of the proposed berms. The proponent has applied to Environment ...

Project Birch Narrows Dene Nation Community Centre

  • Location (Birch Narrows Dene Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88554
  • Last Modified: 2024-05-14
  • Relevance: 798.63
  • The project involves the construction of a new community center within the Birch Narrows Dene Nation, adjacent to the community arena and store. The community center will be a 3,070.8 square meter facility, with support buildings including three (3) mental health suites and a sweat lodge/land-based learning facility with an expected lifespan of 25+ years. The scope of work includes site preparation (clearing of trees and grading of the site to support adequate drainage), construction of ...

Project Big River First Nation Reserve Drainage Re-Establishment

  • Location (Big River First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88496
  • Last Modified: 2024-05-14
  • Relevance: 798.62
  • Big River First Nation is proposing a new clear span bridge over the Big River to replace the three existing 2.3 meter diameter culverts. The project will consist of removing existing culverts, excavating for a new channel bed to match existing upstream and downstream channel bed, installing 3:1 sloped embankments at the bridge armored with rip rap in and near the water to prevent erosion during high flows. Construction of the new bridge abutments and wing walls will occur at the top of the ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Authorities Display Filters

Date modified: