Dakota Tipi First Nation - New Jordan's Principle Facility
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Construction of a 2220 SM multi use facility located near the existing band office.
Sub-structure: Cast-in-place concrete friction piles with grade beams (refer to Geotechnical
Report).
- Floor assembly: concrete slab on grade with subgrade preparation per geotechnical report.
- Structure: Load bearing wood stud framing
- Roof: 75% prefabricated wood truss, 25% vaulted glulam exposed structure
- Exterior Envelope: fiber cement siding, standing-seam prefinished steel roof
- Interior walls: wood stud partitions, with acoustic insulation, 16mm gypsum wall board, paint
- Interior ceilings: 2.7m height typical, 3.6m high in MPR
- 50% acoustic ceiling tile system
- 25% painted gypsum board
- 25% exposed wood deck at glulam structure
- Interior floors: Sheet vinyl flooring, with rubber base; Slip resistant sheet vinyl in kitchen; Rubber sports flooring in physio therapy room; Vinyl hand-rails along public corridors (not in administration) and Movable Partition Walls: 3.6m high in MPR (2 locations)
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | July 25, 2024 |
Contacts
Indigenous Services CanadaTebesi Mosala, Senior Environmental Specialist
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-298-2329
Email: tebesi.mosala@sac-isc.gc.ca
-
Location
- Dakota Tipi First Nation (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2024-07-25 -
Proponent
Dakota Tipi First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
88758
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Morden Pesticide and Chemical Building Project
Morden -
Energy East Project
Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
East Trails Project - East Gate
Riding Mountain National Park -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Vivian Sand Project
Springfield -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
New Fibre Installation
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Lena Port of Entry Redevelopment
Lena Port of Entry -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Smallmouth Bass Project
Riding Mountain National Park -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation - Transitional Housing
Black River First Nation -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Fibre Installation
Hollow Water First Nation no.10