Building Construction - Canadian Forces Base Shilo
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Department of National Defence (DND) has proposed a project which involves the construction of a new facility building, which will be located in the southwestern portion of CFB Shilo, Manitoba. The Project will involve the following Project components: Mobilization and demobilization of Project personnel, equipment, and materials and construction and reclamation of the temporary laydown area(s); Construction of the Ground Based Optical (GBO) System and associated infrastructure including access road and utilities; Operation and regular maintenance of the GBO System throughout the Project life; and Accidents, malfunctions, and unplanned events throughout the Project life. DND is responsible for managing lands in a sustainable manner, and therefore, the Project must demonstrate that sustainable environmental protection and mitigation measures are provided and implemented throughout all of the Project components.
Latest update
.
Participate
Contacts
Yesukal MulugetaDepartment of National Defence
Yesukal Mulugeta, Project Director
NDHQ - 101 Colonel By Drive
Ottawa, Ontario K1A 0K2
Email: Yesukal.Mulugeta@forces.gc.ca
-
Location
- Canadian Forces Base - Shilo (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-06-22 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
81718
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Clear Lake Campground Area Kayak Launch Site
Riding Mountain National Park -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Lena Port of Entry Redevelopment
Lena Port of Entry -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
East Trails Project - East Gate
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Smallmouth Bass Project
Riding Mountain National Park -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Enbridge Line 3 Replacement Program
Cromer -
Birdtail Sioux Dakota Nation - Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Enbridge Line 3 Replacement Program
Morden -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
TransCanada Energy East Pipeline Project
Moosomin -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Tower Hill VHF Tower
Riding Mountain National Park -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Enbridge Line 3 Replacement Program
Gretna -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Energy East Project
Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
ENV - 292 - EA - Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
White Bear First Nation Community Spray Park
White Bear 70 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site