South Lake Prescribed Fire
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The South Lake Prescribed Fire (PF) is a 925-hectare area located west of Wasagaming bordering the south shores of Clear Lake and surrounding South Lake. This PF unit is also 3 km from the community of Onanole and under a kilometer from the seasonal community of Wasagaming. The objectives of this PF are to improve ecological integrity of grassland habitat and to reduce the risk of wildfire to the surrounding communities by reducing hazardous fuel accumulations. Due to the complexity in boundaries, the area has been divided into three subunits.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | April 26, 2023 |
| 1 | New project being assessed by Parks Canada - Public comments invited from February 22 to March 24, 2023 | - | February 22, 2023 |
Contacts
Riding Mountain National Park135 Wasagaming Drive
Box 299
Onanole, Manitoba R0J 1N0
Telephone: 204-848-7275
Fax: 204-848-2596
Email: rmnp.info@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Riding Mountain National Park of Canada (Manitoba)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2023-02-22 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
84351
Nearby assessments
...within 200 kilometres-
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Tiger Salamander Crossing
Riding Mountain National Park -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
East Trails Project - East Gate
Riding Mountain National Park -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Energy East Project
Moosomin -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Zagime Community Center
Zagime IR #74-3 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Lena Port of Entry Redevelopment
Lena Port of Entry -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
White Bear First Nation Community Spray Park
White Bear 70 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
New Fibre Installation
Project Site 1: White Bear -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
The Key First Nation Firehall
The Key First Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba