Bekevar Wind Energy Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Please note, for the purposes of this environmental review at ISC and NRCan, the below information concentrates on the three quarter sections of Cowessess reserve land that are part of the Bekevar Wind Energy Project, hereafter the "Project Area". The three quarter sections (NW 04-13-05-2, SW 04-13-05-2, SE 04-13-05-2) will host between 1 and 3 wind turbines, access roads and an underground medium-voltage collector system that will connect the turbine(s) to the Project's main substation.
Bekevar Wind L.P., a partnership between Renewable Energy Systems Canada Inc. (RES) and Awasis Nehiyawewini Energy Development, a wholly owned Cowessess First Nation entity, is proposing to develop, construct and operate a net 200MW wind power project south and southeast of Kipling, Saskatchewan. The project would comprise approximately 35 to 40 turbines located on approximately 20,000 acres of private land in the RMs of Hazelwood and Kingsley, as well as on three quarter sections of Cowessess First Nation reserve land (the "General Project Area". The Project would include turbines, access roads, an underground medium-voltage collector system, a substation, an operations and maintenance building and a temporary laydown area.
A project of this size can power more than 90,000 Saskatchewan homes with zero-emission electricity from the wind turbines. Earlier in 2021 Bekevar Wind L.P. entered into a 25-year power purchase agreement with SaskPower.
Temporary infrastructure for this Project will include:
- construction access roads that will enable transport of turbine components and other materials to the wind turbine site. The construction access road limit of disturbance on the land will be 30m in width or less.
- wind turbine laydown area that will allow for cranes and other equipment to access the turbine site area and install the turbine foundation and components. The wind turbine laydown area will be approximately 1 hectare in size around the proposed turbine site.
Permanent infrastructure will include:
- turbine foundation and turbine
- access roads to access the turbines during operations, of 5m in width
- underground medium-voltage cabling that will be trenched or plowed in the fields. The cabling is installed at a depth enabling farming operations to resume after construction.
The Project activities are detailed as follows:
- Pre-planning/preconstruction: such activities have been ongoing and include Indigenous and community consultation, environmental surveys on the site (birds, bats, vegetation assessments, etc.), geotechnical studies, micro-siting of turbines and project design and engineering
- Construction: construction will be undertaken on two periods or phases, as follows:
a) Phase 1, July to December 2022: construction of roads, excavations at turbine sites and construction of foundations
b) Phase 2, May to December 2023: electrical works, substation and O&M building construction, erection of turbines, project energization and site reclamation/clean-up
- Operations: once operational the wind project requires limited footprint and limited presence of staff on site. Approximately 6 to 8 turbine operators will be on-site to manage the project and conduct maintenance. Other regular activities will include snow removal and access road maintenance to enable access to turbines at all times. Only light vehicles are required for these activities.
- Decommissioning: the Project's above ground components will be dismantled and disposed of at the end of the Project life, i.e. at least 25 years after COD. Turbines are disassembled and all parts are taken to recycling facilities or landfill sites for non-recyclable items. The top section of the turbine foundation is also removed to enable farming to resume on the areas occupied by the turbine.
No surface water is present within the project boundary, which is delimited by the footprint of the Project components including temporary construction limits of disturbance. Several wetlands are present within the General Project Area; however these wetlands are typically low quality features that occur as isolated features within an agricultural landscape with surface water present seasonally or after heavy precipitation events.
There is one permanent residence located on the adjacent quarter section to SW 04-13-05-2. No other residences are located on other adjacent quarter sections. It should noted that turbines will be at least 750m from residences, to comply with RES best practices.
There are no unique features on the adjacent land. The area is entirely used for agricultural purposes and includes natural features such as wetlands and small tree stands.
No surface water is present within the project boundary, which is delimited by the footprint of the Project components including temporary construction limits of disturbance. Several wetlands are present within the General Project Area; however these wetlands are typically low quality features that occur as isolated features within an agricultural landscape with surface water present seasonally or after heavy precipitation events.
There is one permanent residence located on the adjacent quarter section to SW 04-13-05-2. No other residences are located on other adjacent quarter sections. It should noted that turbines will be at least 750m from residences, to comply with RES best practices.
There are no unique features on the adjacent land. The area is entirely used for agricultural purposes and includes natural features such as wetlands and small tree stands.
Site-specific wildlife studies were undertaken within the General Project Area. During these studies, no wildlife species at risk (i.e. listed on Schedule 1 of the Species at Risk Act were documented within the identified Project Area. Several wildlife species at risk have been identified in the landscape surrounding the Project Area, and have the potential to occur within the lands covered by this Project Description Form. These species include Common Nighthawk (Chordeiles minor; Threatened), Bobolink (Dolichonyx oryzivorus, Threatened), Barn Swallow (Riparia riparia, Threatened), Red-Headed Woodpecker (Melanerpes cephalus, Endangered), and Little Brown Myotis (Myotis lucifugus, Endangered).
Three individual Common Nighthawks were observed outside of the Project Area. Given the mobility of this species, it has been determined to have the potential to occur within the limits of the Project Area at certain times of year. This species typically uses areas with short, sparse vegetation, including pastures and open forests, for nesting. No impacts to this species, or its habitat, are anticipated to occur during construction. A very small potential exists for operational impacts to this species as a result of interactions with operational wind turbine blades. Bird Studies Canada et al (2018) indicates that this species accounts for less than 0.2% of all bird interactions with operational turbines, with no documented mortalities outside of Ontario. The resulting potential for impact to the species, or its habitat, has been considered negligible.
Ten Bobolinks were observed outside of the Project Area. Given the mobility of this species, it has been determined to have the potential to occur within the limits of the Project Area at certain times of year. This species typically uses tall grasslands, pasture and native prairie for nesting and foraging. No impacts to this species, or its habitat, are anticipated to occur during construction. Bird Studies Canada et al (2018) indicates that this species accounts for 1.25% of all bird interactions with operational turbines, with no documented mortalities outside of Ontario. The resulting potential for impact to the species, or its habitat, has been considered negligible.
Twenty-one flocks, totalling 133 individual Barn Swallows, were observed outside of the Project Area at certain times of year. Given the mobility of this species, it has been determined to have the potential to occur within the limits of the Project Area. This species typically uses buildings in agricultural and residential areas, mainly in the Grassland and Parkland Natural regions, for nesting. No impacts to this species, or its habitat, are anticipated to occur during construction. Bird Studies Canada et al (2018) indicates that this species accounts for 1.19% of all bird interactions with operational turbines, with no documented mortalities outside of Ontario. The resulting potential for impact to the species, or its habitat, has been considered negligible.
One individual Red-Headed Woodpecker was observed outside of the Project Area. Given the mobility of this species, it has been determined to have the potential to occur within the limits of the Project Area at certain times of year. This species uses open forests, tree rows in agricultural areas, and wetlands with standing timber for nesting and foraging. The location where it was observed has a larger forested habitat, which is not present in the Project Area, therefore, it is not expect that this species would be present in the Project Area. No impacts to this species, or its habitat, are anticipated to occur during construction. Bird Studies Canada et al (2018) indicates that there are no documented mortalities as a result of an interaction with a wind turbine, in Canada. The resulting potential for impact to the species, or its habitat, has been considered negligible.
Seventy-five Little Brown Myotis calls were recorded outside of the Project Area during acoustic bat surveys conducted in the spring and fall periods. Calls for this species accounted for <0.01% of the total number of bat calls that were recorded. Given the mobility of this species, it has been determined to have the potential to occur within the limits of the Project Area at certain times of year. This species establishes summer maternity colonies in buildings or large diameter trees, and forages for insects mainly over water. They overwinter in hibernacula that are cold and humid, including caves and mines. No preferred habitat for this species has been identified within the Project boundary, and no impacts to this species, or its habitat, are anticipated to occur during construction. The potential for wind turbines to impact individual bats of this species are low in this region of Canada (BSC et al 2018). The resulting potential for impact to the species is minimal, with no expected impacts to the habitat for this species.
Latest update
NRCan issued its notice of determination NRCan Notice of Determination for Bekevar Wind Energy Project - Canada.ca (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
10 | ISC Notice of Determination for Bekevar Wind Energy Project | - | August 2, 2022 |
11 | NRCan Notice of Determination for Bekevar Wind Energy Project | PDF (395 KB) | July 27, 2022 |
9 | Mitigation measures | PDF (166 KB) | June 17, 2022 |
8 | ECCC comments May 20 | PDF (135 KB) | May 20, 2022 |
7 | Response to s. 85 ECCC comments | PDF (240 KB) | April 21, 2022 |
5 | Updated Environment Impact Statement March 2022 | PDF (78.2 MB) | March 25, 2022 |
6 | s. 85 comments ECCC | PDF (244 KB) | March 16, 2022 |
3 | Environmental Impact Statement | PDF (61 MB) | December 20, 2021 |
2 | Project map | PDF (678 KB) | December 17, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | December 2, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Cowessess IR No. 73A (Saskatchewan)
-
Nature of Activity
- Alternative Energy
-
Assessment Status
Completed -
Start Date
2021-12-02 -
Proponent
Bekevar Wind L.P. -
Authorities
- Indigenous Services Canada
- Natural Resources Canada
-
Assessment Type
Project on federal lands -
Reference Number
83231
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
White Bear First Nation Community Spray Park
White Bear 70 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Energy East Project
Moosomin -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Zagime Community Center
Zagime IR #74-3 -
North Portal Septic Tank Replacement
North Portal -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
New (Multiple) Tower Construction
School Tower -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Runway De-Icing Liquid Storage Tank
Regina -
Runway 13-31 Rehabilitation
Regina -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Muskowekwan Potash Mine Project
Lestock -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
WireIE (Canada) Inc. - Antenna Structure - Regway Border Crossing, Hwy 6, Regway SK
Regway Border Crossing -
Regway Port of Entry Redevelopment
Regway Port of Entry -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Smallmouth Bass Project
Riding Mountain National Park