Pope National Wildlife Area Water Control Structure Renaturalization Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Ducks Unlimited Canada (DUC) is proposing to breach a water control structure and re-naturalize the upstream wetland basins within the Pope National Wildlife Area (NWA). This project currently affects wetland and upland management with one (1) water control structure controlling water levels and conveyance throughout the complex.
The Pope National Wildlife Area is administered under the Wildlife Area Regulations of the Canada Wildlife Act. The 30 hectare National Wildlife Area contains approximately 16 hectares of freshwater wetlands. The water control dam was built by Canadian National Railway in 1926 to hold back water for refilling steam engines. Ducks Unlimited Canada was given control of the area to manage it for wildlife 1967. Due to its age, the earthen dam and water control structure has deteriorated and soon will not be able to maintain water levels within this wetland.
The scope of this project includes:
- Breach of earthen dam, including controlled drawdown of water to natural (pre-dam) levels, resulting in a roughly 3.25 hectare remaining freshwater wetland after the work is complete.
- Reclamation of surfaces exposed during the breach using fully photodegradable erosion control blankets and an appropriate seed mix.
- Re-vegetation with native plant species of upland and wetland habitats that were formerly underwater prior to the dam breach.
This work will disturb the current vegetation.
The proposed work will be completed in mid-summer 2024. Water drawdown will begin after July 15 to leave the area undisturbed during the migratory bird breeding season. Any disturbance to migratory birds and other wildlife will be minimal. All exposed soil surfaces will be seeded with suitable grass species and other riparian species in the fall 2024 and spring 2025.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | April 24, 2023 |
Contacts
Canadian Wildlife Service, Environment and Climate Change CanadaJeffrey Harder, Protected Areas Specialist
115 Perimeter Road
Saskatoon, Saskatchewan S7N 0X4
Telephone: 306-241-0411
Email: jeffrey.harder@ec.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Pope National Wildlife Area (Manitoba)
-
Nature of Activity
- Dams and reservoirs
-
Assessment Status
Terminated -
Start Date
2023-04-24 -
Proponent
Ducks Unlimited Canada -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
84538
Nearby assessments
...within 200 kilometres-
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Energy East Project
Moosomin -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
East Trails Project - East Gate
Riding Mountain National Park -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
White Bear First Nation Community Spray Park
White Bear 70 -
New Fibre Installation
Project Site 1: White Bear -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Lena Port of Entry Redevelopment
Lena Port of Entry -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Zagime Community Center
Zagime IR #74-3 -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
North Portal Septic Tank Replacement
North Portal -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76