New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Valley Fiber Communications LP plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in Lake Manitoba, Buffalo Point First Nation, Black River First Nation, Wanipigow (Hollow Water), Ebb and Flow, Opaskwayak Cree Nation, Chemawawin Cree Nation, Fisher River Cree Nation, and A Kwis Ki Mahka. The project involves the installation of approximately 300 km of fiber optic cable in regions surrounding Winnipeg, and the remote northern route, west of Lake Winnipeg and up to Gillam, in the province of Manitoba.
The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.
Latest update
July 10, 2025 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 3 | Notice of Determination | - | July 10, 2025 |
| 2 | Complete List of Locations | - | June 10, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | June 10, 2025 |
Contacts
Innovation, Science and Economic Development CanadaAlexy Hajjar, Senior Engineer, Connected Canada Branch
C.D. Howe Building
235 Queen Street
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project site: Various parts of Manitoba (Manitoba)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-06-10 -
Proponent
Valley Fiber Communications LP -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
89623
Nearby assessments
...within 200 kilometres-
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
East Trails Project - East Gate
Riding Mountain National Park -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Tiger Salamander Crossing
Riding Mountain National Park -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Energy East Project
Winnipeg -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation - Transitional Housing
Black River First Nation -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water Wharf Construction
Hollow Water -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Vivian Sand Project
Springfield -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Morden Pesticide and Chemical Building Project
Morden -
Berens River First Nation Road Upgrades
Berens River -
Stanley Trail Association Community Pathway Project
Morden -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa